CERC · Central Electricity Regulatory Commission

Draft Indian Electricity Grid Code (Fifth Amendment) Regulation, 2016 — Public Notice

Draft Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fifth Amendment) Regulation, 2016

Public notice on a draftDated 9 Dec 2016No. L-1/18/2010-CERC dated 9th December, 2016

Draft

The draft has since been finalised as the Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017.

Public notice on the draft Indian Electricity Grid Code, 2010 — Fifth Amendment, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's public notice opening stakeholder consultation on a draft amendment to the Indian Electricity Grid Code (p1). The Commission states that, using its powers under s.79(1)(h) read with s.178 of the Electricity Act 2003, it has prepared draft regulations — the CERC (Indian Electricity Grid Code) (Fifth Amendment) Regulation, 2016 — to further amend certain provisions of the CERC (Indian Electricity Grid Code) Regulations, 2010, as amended from time to time (p1). The draft regulation, together with an Explanatory Memorandum, is said to be annexed to the notice and available for download (p1).

Under s.178(3) read with the Electricity (Procedure for Previous Publication) Rules, 2005, the Commission invites suggestions, objections and comments from stakeholders and interested persons, to be sent to the Secretary by 30.12.2016; comments arriving later may not be considered when the regulations are finalised (p1). The notice itself does not set out the amendments — it is purely the consultation step, and the text of the proposed changes must be read from the annexed draft and memorandum (p1).

Standard name
Grid Code

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.