Skip to content

CERC · Central Electricity Regulatory Commission

Explanatory Memorandum to the IEGC amendments (spinning reserves, ancillary services, un-requisitioned power)

Explanatory Memorandum

Explanatory memorandum to a draftReleased with the notice dated 9 Dec 2016

Draft

The draft has since been finalised as the Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017.

Explanatory memorandum to the draft Indian Electricity Grid Code, 2010 — Fifth Amendment, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum setting out why the Indian Electricity Grid Code (IEGC) — called the Principal Regulations — should be amended, and what each proposed change is meant to achieve. It is a rationale document rather than the amending text: for each proposal it cites the committee report, Commission order or Tariff Policy provision that prompted it.

Items 1–3 (p1–2) deal with ancillary and reserve services. Item 1 replaces the IEGC definition of spinning reserves so that primary response (governor action) is separated from secondary response (AGC), following the Committee on Spinning Reserve report and the Commission order accepting it. Item 2 amends the definitions clause so that terms defined in other CERC regulations need not be re-inserted into the IEGC each time. Item 3 extends the scope clause of Part-I to cover scheduling and despatch of ISGS power for ancillary reserve services, for un-requisitioned power and for spinning reserves, describing the flow of information between ISGS, NLDC, RLDCs, power exchanges and SLDCs.

Item 4 (p2) proposes consequential Part 2 amendments assigning the new roles and responsibilities to NLDC, RLDCs, SLDCs and RPCs.

Item 5 (p2–3) concerns primary response through governor action: it proposes raising the small-hydro threshold below which such response is not required from 10 MW to 25 MW, and bringing open cycle gas turbine/combined cycle stations with gas turbines of more than 50 MW each within the requirement. It also restates the extent of primary response required from ISGS units, removes the exemption for gas/combined-cycle stations, and proposes that RLDCs/SLDCs not schedule units beyond ex-bus generation at 100% of installed capacity, with no valve-wide-open operation.

Item 6 (p3–4) transposes the Tariff Policy's un-requisitioned power provisions into Regulation 6.5: two-day-ahead scheduling to give 24 hours' notice, first right of original beneficiaries to requisition URS, a rescheduling window, communication deadlines, a bar on recalling power already sold, and sharing of gains. A new Regulation 6.5(a) would set the methodology for scheduling and commercial settlement of ancillary services and URS.

Standard name
Grid Code
Primary topics
Ancillary services and reserves, Grid operation and grid code, Scheduling and despatch

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document