CERC · Central Electricity Regulatory Commission
Explanatory Memorandum to the IEGC amendments (spinning reserves, ancillary services, un-requisitioned power)
Explanatory Memorandum
Explanatory memorandum to a draftReleased with the notice dated 9 Dec 2016
Draft
The draft has since been finalised as the Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017.
Explanatory memorandum to the draft Indian Electricity Grid Code, 2010 — Fifth Amendment, 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's explanatory memorandum setting out why the Indian Electricity Grid Code (IEGC) — called the Principal Regulations — should be amended, and what each proposed change is meant to achieve. It is a rationale document rather than the amending text: for each proposal it cites the committee report, Commission order or Tariff Policy provision that prompted it.
Items 1–3 (p1–2) deal with ancillary and reserve services. Item 1 replaces the IEGC definition of spinning reserves so that primary response (governor action) is separated from secondary response (AGC), following the Committee on Spinning Reserve report and the Commission order accepting it. Item 2 amends the definitions clause so that terms defined in other CERC regulations need not be re-inserted into the IEGC each time. Item 3 extends the scope clause of Part-I to cover scheduling and despatch of ISGS power for ancillary reserve services, for un-requisitioned power and for spinning reserves, describing the flow of information between ISGS, NLDC, RLDCs, power exchanges and SLDCs.
Item 4 (p2) proposes consequential Part 2 amendments assigning the new roles and responsibilities to NLDC, RLDCs, SLDCs and RPCs.
Item 5 (p2–3) concerns primary response through governor action: it proposes raising the small-hydro threshold below which such response is not required from 10 MW to 25 MW, and bringing open cycle gas turbine/combined cycle stations with gas turbines of more than 50 MW each within the requirement. It also restates the extent of primary response required from ISGS units, removes the exemption for gas/combined-cycle stations, and proposes that RLDCs/SLDCs not schedule units beyond ex-bus generation at 100% of installed capacity, with no valve-wide-open operation.
Item 6 (p3–4) transposes the Tariff Policy's un-requisitioned power provisions into Regulation 6.5: two-day-ahead scheduling to give 24 hours' notice, first right of original beneficiaries to requisition URS, a rescheduling window, communication deadlines, a bar on recalling power already sold, and sharing of gains. A new Regulation 6.5(a) would set the methodology for scheduling and commercial settlement of ancillary services and URS.
Read with this
The regulation
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
Amendments and corrections
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Corrigendum
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Addendum
- Dated 5 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code, 2010 — Second Amendment, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Regulation 6.3B Commencement Notification, 2017
- Dated 5 Sep 2019Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017 — Erratum
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020IEGC Regulations, 2010 — Sixth Amendment, 2019 — Commencement Notification, 2020
- Dated 17 May 2020IEGC Regulations, 2010 — Sixth Amendment — Corrigendum
Commencement notices and reasons
- Dated 18 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Statement of Objects and Reasons
- Dated 6 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012 — Statement of Objects and Reasons
- Dated 6 Apr 2016Indian Electricity Grid Code, 2010 — Fourth Amendment, 2016 — Statement of Reasons
- Dated 13 Apr 2018Indian Electricity Grid Code (5th Amendment), 2017 — Statement of Reasons
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 26 Apr 2010Indian Electricity Grid Code, 2010 — Order directing Gazette publication
- Dated 14 Jan 2011Extension of Date of Operation of Clauses 5 and 7 of Annexure-I, IEGC 2010 — Notification
- Dated 14 Jan 2011Extension of date of operation of Clauses 5 and 7 of Annexure-I, IEGC 2010
- Dated 18 Feb 2011Approval of Detailed Procedure for Implementation of Renewable Regulatory Fund Mechanism under IEGC Regulations, 2010
- Dated 5 May 2017Reserve Shut Down and Compensation Mechanism Order, 2017
- Dated 9 Oct 2019Methodology of Settlement of Accounts for Bilateral Short Term and Collective Transactions during Grid Disturbance — Order
Other copies of these documents (9)
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
- Dated 5 Mar 2012Indian Electricity Grid Code, 2010 — First Amendment, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code (Second Amendment) Regulations, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Commencement Notification, 2017
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
Earlier drafts
- Dated 12 Aug 2013Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 12 Aug 2013Explanatory memorandum: IEGC (Second Amendment) Regulations, 2013 — Explanatory Memorandum
- Dated 12 Aug 2013Public notice: Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Public Notice — Draft
- Released with the notice dated 31 Mar 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015 — Draft
- Dated 2 Jul 2015Draft Indian Electricity Grid Code Regulations, 2015 — Public Notice
- Dated 2 Jul 2015Indian Electricity Grid Code, 2010 — Fourth Amendment Regulations, 2015 — Draft
- Released with the notice dated 9 Dec 2016Indian Electricity Grid Code, 2010 — Fifth Amendment, 2016
- Dated 9 Dec 2016Public notice: Draft Indian Electricity Grid Code (Fifth Amendment) Regulation, 2016 — Public Notice
- Dated 6 Aug 2019Indian Electricity Grid Code, 2010 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.