CERC · Central Electricity Regulatory Commission

Reserve Shut Down and Compensation Mechanism Order, 2017

Approval of the detailed procedure for taking unit(s) under Reserve Shut Down and Mechanism for Compensation for Degradation of Heat Rate, Aux Compensation and Secondary Fuel Consumption, due to Part Load Operation and Multiple Start/Stop of Units

ProcedureDated 5 May 2017In force from 15 May 2017No. L-1/219/2017-CERC dated 5 th May 2017

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Indian Electricity Grid Code Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission approves two instruments required by the Fourth Amendment (2016) to the Indian Electricity Grid Code: a Detailed Operating Procedure (DOP) for putting generating units under Reserve Shut Down (RSD), prepared by NLDC/POSOCO, and a Compensation Mechanism worked out by the Regional Power Committees (pp1–2). The order records that the DOP and the mechanism were finalised after consultation with NLDC, RLDCs, CEA and RPCs, and that the Commission considered the DOP in light of the CEA Regulations (p4). The order directs RPCs to give feedback on the operation of the Compensation Mechanism within six months, and NLDC to deliberate on the existing WRPC RSD procedure and report feasibility within six months (pp2–3).

The DOP (Appendix I, pp4–12) lays down the day-ahead and real-time procedure for scheduling a station below its Technical Minimum Schedule, the information generators must declare, the timelines for requisition and schedule revisions (R0, R-1), and the conditions under which RLDC may suo motu give a technical-minimum schedule. It sets out the methodology for taking units under RSD, the process for revival from RSD, and review after six months.

The Compensation Mechanism (Appendix II, pp14–23) applies to coal/gas CGS and ISGS whose tariff is determined or adopted by the Commission. It sets out how to compute compensation for degradation of station heat rate and auxiliary energy consumption from part-load operation, and for secondary fuel oil consumption from additional start-ups, including the formulae for energy charge rate at different loadings, the conditions under which no compensation is payable, how cost is shared among beneficiaries, and the data to be submitted to RPC secretariats. Both instruments come into force from 15.5.2017 (p3).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Generation tariff

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.