Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code, 2010 — Third Amendment, 2015

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Third Amendment) Regulations, 2015

Amendment · Gazette copyDated 7 Aug 2015Published in the Gazette 10 Aug 2015In force from 1 Nov 2015No. 1/14/2015-Reg. Aff. (FSDS) (i)/CERC. dated 7th August, 2015

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Indian Electricity Grid Code, 2010 — Third Amendment, 2015.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's Third Amendment to the Indian Electricity Grid Code, 2010, notified on 7 August 2015 and brought into force from 1 November 2015 (p3). Its single purpose is to write wind and solar generation — specifically "wind and solar generators which are regional entities" — into the grid code's scheduling and despatch machinery, in line with the Government of India's thrust on renewable sources of energy. Eleven clauses amend the Principal Regulations as already amended by the First and Second Amendments (p3).

Clauses 1–2 (p3) give the short title and commencement date and rewrite the description of Part 6 (Scheduling and Despatch Code) so that it covers scheduling and despatch of Inter-State Generating Stations and other long-term, medium-term and short-term open access transactions, on a day-ahead and intra-day basis, expressly bringing in variable wind and solar generation. Clause 3 (p4) redefines "Pool Account" to cover Deviation Charge, Reactive Energy and Congestion Charge accounts. Clause 4 (p4) relocates responsibility for preparing the monthly Regional Energy Account, weekly deviation charge account, reactive energy account and congestion charge account to the RPC Secretariat, drawing on RLDC data and, for regional-entity wind and solar generators, SLDC/RLDC data. Clause 5 (p4) requires each RLDC's daily regional grid performance report to cover wind and solar generation. Clause 6 (p4) replaces the old three-hourly re-scheduling and Renewable Regulatory Charge with one-and-half-hourly re-scheduling and handling of deviations through the DSM Regulations, with metering, telemetry and data acquisition obligations.

Clauses 7–8 (p4–5) bring wind and solar projects of 500 MW and above into the Ultra Mega Power Project category, and replace Regulation 6.5(23) with detailed obligations on technical and weather data, parallel forecasting by the generator and the RLDC, the generator's option to choose the RLDC's forecast and bear the commercial consequences, and the limits on schedule revision.

Clauses 9–11 (p5) amend Annexure-1: forecasting intervals and the day-ahead forecast obligation for aggregate capacity of 50 MW and above, schedule revision rules for inter-State supply under long-term, medium-term or short-term open access, deviation charges for regional-entity wind and solar delinked from frequency and settled under the DSM Regulations, 2014, and deletion of the old paras 6, 7 and 9.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Deviation settlement (DSM)

Read with this

The regulation

Other copies of these documents (8)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗