CERC · Central Electricity Regulatory Commission
Indian Electricity Grid Code, 2010 — Third Amendment, 2015
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Third Amendment) Regulations, 2015
Amendment · Gazette copyDated 7 Aug 2015Published in the Gazette 10 Aug 2015In force from 1 Nov 2015No. 1/14/2015-Reg. Aff. (FSDS) (i)/CERC. dated 7th August, 2015
Replaced by Indian Electricity Grid Code Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Indian Electricity Grid Code, 2010 — Third Amendment, 2015.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission's Third Amendment to the Indian Electricity Grid Code, 2010, notified on 7 August 2015 and brought into force from 1 November 2015 (p3). Its single purpose is to write wind and solar generation — specifically "wind and solar generators which are regional entities" — into the grid code's scheduling and despatch machinery, in line with the Government of India's thrust on renewable sources of energy. Eleven clauses amend the Principal Regulations as already amended by the First and Second Amendments (p3).
Clauses 1–2 (p3) give the short title and commencement date and rewrite the description of Part 6 (Scheduling and Despatch Code) so that it covers scheduling and despatch of Inter-State Generating Stations and other long-term, medium-term and short-term open access transactions, on a day-ahead and intra-day basis, expressly bringing in variable wind and solar generation. Clause 3 (p4) redefines "Pool Account" to cover Deviation Charge, Reactive Energy and Congestion Charge accounts. Clause 4 (p4) relocates responsibility for preparing the monthly Regional Energy Account, weekly deviation charge account, reactive energy account and congestion charge account to the RPC Secretariat, drawing on RLDC data and, for regional-entity wind and solar generators, SLDC/RLDC data. Clause 5 (p4) requires each RLDC's daily regional grid performance report to cover wind and solar generation. Clause 6 (p4) replaces the old three-hourly re-scheduling and Renewable Regulatory Charge with one-and-half-hourly re-scheduling and handling of deviations through the DSM Regulations, with metering, telemetry and data acquisition obligations.
Clauses 7–8 (p4–5) bring wind and solar projects of 500 MW and above into the Ultra Mega Power Project category, and replace Regulation 6.5(23) with detailed obligations on technical and weather data, parallel forecasting by the generator and the RLDC, the generator's option to choose the RLDC's forecast and bear the commercial consequences, and the limits on schedule revision.
Clauses 9–11 (p5) amend Annexure-1: forecasting intervals and the day-ahead forecast obligation for aggregate capacity of 50 MW and above, schedule revision rules for inter-State supply under long-term, medium-term or short-term open access, deviation charges for regional-entity wind and solar delinked from frequency and settled under the DSM Regulations, 2014, and deletion of the old paras 6, 7 and 9.
Read with this
The regulation
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
Amendments and corrections
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Corrigendum
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Addendum
- Dated 5 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code, 2010 — Second Amendment, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Regulation 6.3B Commencement Notification, 2017
- Dated 5 Sep 2019Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017 — Erratum
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020IEGC Regulations, 2010 — Sixth Amendment, 2019 — Commencement Notification, 2020
- Dated 17 May 2020IEGC Regulations, 2010 — Sixth Amendment — Corrigendum
Commencement notices and reasons
- Dated 18 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Statement of Objects and Reasons
- Dated 6 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012 — Statement of Objects and Reasons
- Dated 6 Apr 2016Indian Electricity Grid Code, 2010 — Fourth Amendment, 2016 — Statement of Reasons
- Dated 13 Apr 2018Indian Electricity Grid Code (5th Amendment), 2017 — Statement of Reasons
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 26 Apr 2010Indian Electricity Grid Code, 2010 — Order directing Gazette publication
- Dated 14 Jan 2011Extension of Date of Operation of Clauses 5 and 7 of Annexure-I, IEGC 2010 — Notification
- Dated 14 Jan 2011Extension of date of operation of Clauses 5 and 7 of Annexure-I, IEGC 2010
- Dated 18 Feb 2011Approval of Detailed Procedure for Implementation of Renewable Regulatory Fund Mechanism under IEGC Regulations, 2010
- Dated 5 May 2017Reserve Shut Down and Compensation Mechanism Order, 2017
- Dated 9 Oct 2019Methodology of Settlement of Accounts for Bilateral Short Term and Collective Transactions during Grid Disturbance — Order
Other copies of these documents (8)
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
- Dated 5 Mar 2012Indian Electricity Grid Code, 2010 — First Amendment, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code (Second Amendment) Regulations, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Commencement Notification, 2017
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
Earlier drafts
- Dated 12 Aug 2013Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 12 Aug 2013Explanatory memorandum: IEGC (Second Amendment) Regulations, 2013 — Explanatory Memorandum
- Dated 12 Aug 2013Public notice: Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Public Notice — Draft
- Released with the notice dated 31 Mar 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015 — Draft
- Dated 2 Jul 2015Draft Indian Electricity Grid Code Regulations, 2015 — Public Notice
- Dated 2 Jul 2015Indian Electricity Grid Code, 2010 — Fourth Amendment Regulations, 2015 — Draft
- Released with the notice dated 9 Dec 2016Indian Electricity Grid Code, 2010 — Fifth Amendment, 2016
- Dated 9 Dec 2016Public notice: Draft Indian Electricity Grid Code (Fifth Amendment) Regulation, 2016 — Public Notice
- Released with the notice dated 9 Dec 2016Explanatory memorandum: Explanatory Memorandum to the IEGC amendments (spinning reserves, ancillary services, un-requisitioned power)
- Dated 6 Aug 2019Indian Electricity Grid Code, 2010 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.