CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code, 2010 — Fourth Amendment Regulations, 2015 — Draft

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fourth Amendment) Regulations, 2015

Draft amendmentDated 2 Jul 2015No.L-1/18/2010-CERC dated 2 nd July, 2015

Draft

A proposal that has since been finalised as the Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's draft Fourth Amendment to the Indian Electricity Grid Code, 2010, dated 2 July 2015. It builds a procedure around two matters the Code did not previously carry: how an inter-State generating station declares commercial operation, and the floor load at which it can be required to run (p1–2).

Paragraph 2 adds three definitions to Regulation 2 — COD, Trial Operation/Trial Run and Technical Minimum Schedule — each by cross-reference to the new provisions rather than by stating the meaning itself (p1). Paragraphs 3 and 4 amend Regulations 6.1 and 6.2 so that the Code's stated scope covers the COD declaration procedure and the technical minimum schedule (p1–2).

Paragraph 5 inserts a new Regulation 6.3A. Sub-regulation 1 lays down the COD test for thermal units and blocks: demonstration of unit capacity on designated fuel through a successful trial run, clearance from the RLDC or SLDC, notice to beneficiaries or buyers before trial run, a certificate signed by the CMD/CEO/MD covering technical standards, plant and auxiliary systems and permanent supply, instrumentation and protection systems, with board approval to follow within a set period; it also covers partial loading, the demonstrated-capacity threshold for COD, the despatch centre's clearance timeline and the start of scheduling (p2–4). Sub-regulation 2 does the same for hydro, including pumped storage, using peaking capability as the test, with special treatment for pondage/storage stations and run-of-river stations that cannot demonstrate peaking when reservoir or inflow levels are insufficient (p4–6). Sub-regulation 3 defines trial run duration and permitted interruptions, and sub-regulation 4 gives these provisions precedence over the Tariff Regulations, 2014 where they conflict (p6).

The final insertion, Regulation 6.3B, fixes the technical minimum schedule for ISGS, enables RLDC directions to operate below a stated load down to that minimum, and creates a compensation route — subject to prudence check — with a station heat rate degradation table for coal/lignite stations, treatment of start-up fuel for reserve shut-down beyond a stated number of start/stops, a rule on which entity ultimately bears the cost, a PPA requirement for stations outside the Commission's regulation, annual emission reporting and an NLDC-prescribed operating procedure for contingency back-down (p7–8).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗