CERC · Central Electricity Regulatory Commission
Indian Electricity Grid Code Regulations, 2010
Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010
Regulation · Gazette copyDated 28 Apr 2010In force from 3 May 2010F. No. L-1/18/2010-CERC dated 28th April, 2010
Replaced by Indian Electricity Grid Code Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Indian Electricity Grid Code Regulations, 2010.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”
Summary
Summary written by software, from pages 1 to 104 of 143. Check the regulator's original before you rely on it.
These are the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010, notified as F.No. L-1/18/2010-CERC dated 28 April 2010 (p74). The Code is the single set of technical and commercial rules for the inter-State transmission system: it comes into force on 3 May 2010 and supersedes the Indian Electricity Grid Code, 2006 that had effect from 1 April 2006 (p74). It is made under the Electricity Act, 2003, s.79(1)(h) read with s.178(2)(g) (p74).
After a definitions section (pp74–81), Part 1 sets out the general framework: the objective of bringing Users, NLDC, RLDC and SLDC relationships into one rulebook, facilitating optimal grid operation, power markets, ancillary services and renewable-energy integration (pp82–83). Its scope binds all Users, SLDCs, RLDCs, NLDC, CEA, CTU, STUs, licensees, RPCs and Power Exchanges; it treats DVC like a State Electricity Board, treats BBMB and Sardar Sarovar generation as intra-State for this Code, and treats interconnected neighbouring-country grids as separate control areas (p83). It creates compliance oversight: RLDCs and RPCs report violations and non-compliance to the Commission, any person may petition CERC, and the Commission may act suo-motu (pp85–86).
Part 2 assigns roles and linkages for NLDC, RLDC, RPC, CTU, CEA, SLDC and STU, largely restating their statutory functions (pp86–93). It includes NLDC as apex body for national grid operation and nodal agency for collective transactions; RLDC as regional apex and nodal agency for short-term bilateral open access; RPC monitoring and certification functions; CTU as nodal agency for connectivity, long-term access and medium-term open access; CEA planning/standards roles; SLDC concurrence for short-term open access; and STU intra-State planning/open access duties (pp86–93).
Part 3 is the Planning Code for inter-State transmission (pp93–98). It states planning philosophy, criteria for withstanding specified contingency outages without load shedding or with generation rescheduling, substation transformer redundancy, reactive compensation planning, and data-exchange/implementation procedures linked to the CERC Connectivity Regulations, 2009.
Part 4 is the Connection Code (pp98–101). It applies to CTU, STU and all Users connected to or seeking connection to ISTS, and does not apply to embedded intra-State systems not connected to ISTS (but CEA standards apply). It covers the connection application and agreement route, reactive power compensation, data and communication facilities, system recording instruments, safety responsibilities, cyber security, international connections, and an annual schedule of regional-grid transmission assets to CERC by 30 September.
Part 5, the Operating Code, begins at p101. It covers operating philosophy, system security, restrictions on opening important grid elements, tripping intimation, governor operation for thermal units of 200 MW and above and hydro units of 10 MW and above, restricted governor mode dates from 1 August 2010, exemption of gas, wind, solar and nuclear units from certain governor clauses until Commission review, and limits on sudden output reduction (pp101–104).
Part 6 is said to cover day-ahead and intra-day scheduling of ISGS and long-term, medium-term and short-term open access transactions, including wind and solar scheduling (p85).
Read with this
The regulation
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
Amendments and corrections
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Corrigendum
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Addendum
- Dated 5 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code, 2010 — Second Amendment, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Regulation 6.3B Commencement Notification, 2017
- Dated 5 Sep 2019Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017 — Erratum
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020IEGC Regulations, 2010 — Sixth Amendment, 2019 — Commencement Notification, 2020
- Dated 17 May 2020IEGC Regulations, 2010 — Sixth Amendment — Corrigendum
Commencement notices and reasons
- Dated 18 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Statement of Objects and Reasons
- Dated 6 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012 — Statement of Objects and Reasons
- Dated 6 Apr 2016Indian Electricity Grid Code, 2010 — Fourth Amendment, 2016 — Statement of Reasons
- Dated 13 Apr 2018Indian Electricity Grid Code (5th Amendment), 2017 — Statement of Reasons
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 26 Apr 2010Indian Electricity Grid Code, 2010 — Order directing Gazette publication
- Dated 14 Jan 2011Extension of Date of Operation of Clauses 5 and 7 of Annexure-I, IEGC 2010 — Notification
- Dated 14 Jan 2011Extension of date of operation of Clauses 5 and 7 of Annexure-I, IEGC 2010
- Dated 18 Feb 2011Approval of Detailed Procedure for Implementation of Renewable Regulatory Fund Mechanism under IEGC Regulations, 2010
- Dated 5 May 2017Reserve Shut Down and Compensation Mechanism Order, 2017
- Dated 9 Oct 2019Methodology of Settlement of Accounts for Bilateral Short Term and Collective Transactions during Grid Disturbance — Order
Other copies of these documents (8)
- Dated 5 Mar 2012Indian Electricity Grid Code, 2010 — First Amendment, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code (Second Amendment) Regulations, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Commencement Notification, 2017
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
Earlier drafts
- Dated 12 Aug 2013Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 12 Aug 2013Explanatory memorandum: IEGC (Second Amendment) Regulations, 2013 — Explanatory Memorandum
- Dated 12 Aug 2013Public notice: Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Public Notice — Draft
- Released with the notice dated 31 Mar 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015 — Draft
- Dated 2 Jul 2015Draft Indian Electricity Grid Code Regulations, 2015 — Public Notice
- Dated 2 Jul 2015Indian Electricity Grid Code, 2010 — Fourth Amendment Regulations, 2015 — Draft
- Released with the notice dated 9 Dec 2016Indian Electricity Grid Code, 2010 — Fifth Amendment, 2016
- Dated 9 Dec 2016Public notice: Draft Indian Electricity Grid Code (Fifth Amendment) Regulation, 2016 — Public Notice
- Released with the notice dated 9 Dec 2016Explanatory memorandum: Explanatory Memorandum to the IEGC amendments (spinning reserves, ancillary services, un-requisitioned power)
- Dated 6 Aug 2019Indian Electricity Grid Code, 2010 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.