Indian Electricity Grid Code Regulations, 2010

Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010

Regulation · Gazette copyDated 28 Apr 2010In force from 3 May 2010F. No. L-1/18/2010-CERC dated 28th April, 2010

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Indian Electricity Grid Code Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 104 of 143. Check the regulator's original before you rely on it.

These are the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010, notified as F.No. L-1/18/2010-CERC dated 28 April 2010 (p74). The Code is the single set of technical and commercial rules for the inter-State transmission system: it comes into force on 3 May 2010 and supersedes the Indian Electricity Grid Code, 2006 that had effect from 1 April 2006 (p74). It is made under the Electricity Act, 2003, s.79(1)(h) read with s.178(2)(g) (p74).

After a definitions section (pp74–81), Part 1 sets out the general framework: the objective of bringing Users, NLDC, RLDC and SLDC relationships into one rulebook, facilitating optimal grid operation, power markets, ancillary services and renewable-energy integration (pp82–83). Its scope binds all Users, SLDCs, RLDCs, NLDC, CEA, CTU, STUs, licensees, RPCs and Power Exchanges; it treats DVC like a State Electricity Board, treats BBMB and Sardar Sarovar generation as intra-State for this Code, and treats interconnected neighbouring-country grids as separate control areas (p83). It creates compliance oversight: RLDCs and RPCs report violations and non-compliance to the Commission, any person may petition CERC, and the Commission may act suo-motu (pp85–86).

Part 2 assigns roles and linkages for NLDC, RLDC, RPC, CTU, CEA, SLDC and STU, largely restating their statutory functions (pp86–93). It includes NLDC as apex body for national grid operation and nodal agency for collective transactions; RLDC as regional apex and nodal agency for short-term bilateral open access; RPC monitoring and certification functions; CTU as nodal agency for connectivity, long-term access and medium-term open access; CEA planning/standards roles; SLDC concurrence for short-term open access; and STU intra-State planning/open access duties (pp86–93).

Part 3 is the Planning Code for inter-State transmission (pp93–98). It states planning philosophy, criteria for withstanding specified contingency outages without load shedding or with generation rescheduling, substation transformer redundancy, reactive compensation planning, and data-exchange/implementation procedures linked to the CERC Connectivity Regulations, 2009.

Part 4 is the Connection Code (pp98–101). It applies to CTU, STU and all Users connected to or seeking connection to ISTS, and does not apply to embedded intra-State systems not connected to ISTS (but CEA standards apply). It covers the connection application and agreement route, reactive power compensation, data and communication facilities, system recording instruments, safety responsibilities, cyber security, international connections, and an annual schedule of regional-grid transmission assets to CERC by 30 September.

Part 5, the Operating Code, begins at p101. It covers operating philosophy, system security, restrictions on opening important grid elements, tripping intimation, governor operation for thermal units of 200 MW and above and hydro units of 10 MW and above, restricted governor mode dates from 1 August 2010, exemption of gas, wind, solar and nuclear units from certain governor clauses until Commission review, and limits on sudden output reduction (pp101–104).

Part 6 is said to cover day-ahead and intra-day scheduling of ISGS and long-term, medium-term and short-term open access transactions, including wind and solar scheduling (p85).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Technical standards, Network planning and investment

Read with this

The regulation

Other copies of these documents (8)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document