CERC · Central Electricity Regulatory Commission

Extension of Date of Operation of Clauses 5 and 7 of Annexure-I, IEGC 2010 — Notification

Extension of date of operation of Clauses 5 and 7 of Annexure-I, IEGC 2010 - Notification

OrderDated 14 Jan 2011No. L-1/18/2010-CERC dated the 14th January, 2011

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Indian Electricity Grid Code Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission issued this one-page notification (p1) on 14 January 2011 to postpone the start of two provisions of the Indian Electricity Grid Code. It records that the IEGC Regulations, 2010 were gazetted on 28.4.2010 and took effect on 3.5.2010, except for provisions given separate dates, and that Clauses (5) and (7) of Annexure-I had been set to commence on 1.1.2011.

Because the procedures and mechanisms those clauses require had not yet been finalised and put in place, the Commission used clause (1) of Part 7 of the IEGC Regulations to substitute 1.1.2012 for 1.1.2011, and notified all concerned accordingly. No other part of the grid code is touched. The notification does not describe what Clauses (5) and (7) of Annexure-I contain, so a reader must go to IEGC 2010 itself to see what is being deferred.

Standard name
Grid Code
Primary topics
Grid operation and grid code

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document