Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Sixth Amendment) Regulations, 2019

Amendment · Gazette copyDated 12 Dec 2019Published in the Gazette 27 Dec 2019No. L-1/18/2010-CERC dated New Delhi, the 12th December, 2019

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Sixth Amendment to the CERC (Indian Electricity Grid Code) Regulations, 2010, issued by the Commission on 12 December 2019 and published in the Gazette of India (Extraordinary) on 27 December 2019 (p1, p4). It is made under s.79(1)(h) read with s.178(2)(g) of the Electricity Act, 2003 and is expressed to come into force on 1 April 2020, or such other date as the Commission may notify (p4). Every substantive change sits in Part 6 of the Principal Regulations, in the scheduling-and-despatch regulation 6.5 (p4–5).

The amendment first aligns the code's market vocabulary with the exchange-based market design, substituting "Day Ahead Market" for "market" in clause 4, and re-titles the scheduling sub-clause of clause 5 as the scheduling of Day-Ahead collective transactions (p4). It then inserts a new sub-clause (aa) establishing the scheduling of Real-time collective transactions, laying out the end-to-end workflow between NLDC, the Power Exchange(s) and RLDCs around corridor margins before gate closure, price and volume announcement, and confirmation of schedules at the regional periphery (p4). Clause 18 is replaced to allow ISGS with two-part tariff to revise declared capability and requisition with advance notice, with the effect of revisions keyed to odd and even time blocks, a definitional note on those blocks and a worked illustration (p4–5). Related replacements cover revision on forced outage (cl.18(a)) and forced outage of units of 100 MW or more selling under short-term bilateral transactions, including intimation duties, schedule revision, and continued payment of transmission charges on the original schedule for a stated period (p5).

The heading of Regulation 6.5(A) is widened to cover Real Time Transactions (p5). Clause (c) there is replaced to let a Commission-tariffed ISGS sell from its original beneficiaries' share — in the day-ahead market with beneficiaries' consent, and in the real-time market without consent — subject to a gain-sharing formula with a ceiling on the ISGS share and a set of provisos protecting beneficiaries' energy charge and fixed-charge liability (p5). A new proviso to clause 30 fixes the curtailment order between day-ahead and real-time collective transactions (p5). Page 6 is a note listing the Principal Regulations' gazette notification and every prior amendment and corrigendum.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Power markets and exchanges

Read with this

The regulation

Other copies of these documents (8)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document