CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017 — Erratum

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fifth Amendment) Regulations, 2017.

CorrigendumDated 5 Sep 2019Published in the Gazette 19 Sep 2019No. L-1/18/2010-CERC. dated 5th September, 2019

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Corrects the Indian Electricity Grid Code Regulations, 2010 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page bilingual erratum from the Central Electricity Regulatory Commission (p1–2). Page 1 is the Hindi version as published in the Gazette of India, Part III—Section 4, dated 19 September 2019; page 2 is the English text, signed by the Secretary and dated 5 September 2019.

The erratum fixes a clerical error in the CERC (Indian Electricity Grid Code) (Fifth Amendment) Regulations, 2017. In clause 4.2 of those regulations, the cross-reference "Regulation 2.2.2(iii)" is to be read as "Regulation 2.2.2(ii)(a)" (p2). Nothing else in the Grid Code is touched.

The correction is deemed to have come into force from the date the Fifth Amendment Regulations 2017 themselves took effect (p2), so the corrected pointer operates from the original commencement date rather than from the erratum's own date. For an analyst, this is a pinpoint fix to the amendment's internal cross-referencing, not a change of substance.

Standard name
Grid Code
Primary topics
Grid operation and grid code

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document