Methodology of Settlement of Accounts for Bilateral Short Term and Collective Transactions during Grid Disturbance — Order

Approval of the "Methodology of settlement of accounts for bilateral short term and collective transactions, for the period of Grid Disturbance" under Regulation 6.5.17 of Central Electricity Regulatory Commission (Indian Electricity Grid Code), Regulation 2010

OrderDated 9 Oct 2019In force from 17 Feb 2014No. L-1/18/2010-CERC dated 9 th October, 2019

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Indian Electricity Grid Code Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC order of 9 October 2019 (No. L-1/18/2010-CERC) approving a national methodology for settling accounts when a grid disturbance cuts short an inter-State generating station's deliveries under bilateral short-term or power-exchange transactions (p1). The order records that Regulation 6.5.17 of the Indian Electricity Grid Code, 2010 — as rewritten by the Second Amendment of 6 January 2014 — already deems the schedule of every affected ISGS to be revised to actual generation and requires the National Power Committee to draft a settlement methodology for the bilateral short-term and collective (exchange) segments (p1–2). NPC's draft of 27 January 2017, prepared through a working group of CEA, RPC/NPC secretariat and NLDC representatives, is annexed at Appendix-I and approved; the Commission's own examination is recorded as complete (p2). The methodology is brought into force from the date the IEGC Second Amendment took effect, 17.02.2014, so it operates retrospectively by more than five years (p2).

The annexed methodology (p3–8) has five sections. Scope restricts it to ISGSs that are regional entities and are affected by any category of grid disturbance under the CEA (Grid Standards) Regulations 2010, with the RLDC certifying the disturbance duration and listing affected stations; ISGSs embedded in an STU system are settled by the concerned SLDC (p3). Section 4.1 creates a separate "Schedule for period of GD" used only for settlement, built by trimming the original schedule in a fixed priority order until it equals actual injection, with pro-rata revision across multiple bilateral or multiple exchange transactions (p4). Sections 4.2 and 4.3 set the settlement mechanics for bilateral short-term and collective transactions respectively — DSM accounts issued on the GD schedule for the ISGS and on original schedules for everyone else, excess amounts recovered from buyers or exchange clearing prices reimbursed to the DSM pool, and a 15-day settlement window after RPC/RLDC intimation (p4–5). Section 5 supplies illustrative worked cases covering full and partial outages across bilateral, exchange, MTOA and LTA portfolios (p5–8).

Standard name
Grid Code
Primary topics
Energy accounting and settlement, Deviation settlement (DSM), Scheduling and despatch

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document