Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code (First Amendment) Regulations, 2012

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2012

AmendmentDated 5 Mar 2012In force from 2 Apr 2012No.L-1/18/2010-CERC dated 5th March, 2012

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Indian Electricity Grid Code Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's First Amendment to the Indian Electricity Grid Code (IEGC) Regulations, 2010, issued on 5 March 2012 and commencing on 2 April 2012 (p1). It is a compact amending instrument: sections 1-13 replace, delete or insert specific provisions in the Principal Regulations rather than restating the grid code.

Sections 2-4 make early textual and institutional changes: the term 'Metering and data collection' becomes 'Meter data processing' in Regulation 2.3.2(d); Regulation 2.5.1(2) is deleted; and Regulation 3.4(c) gives the CTU a route to seek regulatory approval for associated transmission system strengthening where PPAs are unsigned or agreement cannot be reached, under the 2010 CERC approval regulations (p1).

Sections 5-7 are the operational core. They align maintenance, protection, islanding, voltage, restoration and operational-instruction records with the CEA (Grid Standards) Regulations, 2010; add a proviso allowing free governor mode operation with manual intervention where restricted governor mode cannot be used; and revise frequency thresholds and operating bands in several sub-regulations (pp2-3). Section 6 similarly adjusts frequency thresholds in Regulation 5.4.2 (p3).

Sections 8-11 revise planning and despatch. Regulation 5.7.4 is replaced to make RPC Secretariats responsible for the annual LGBR and outage plan, set submission and finalisation deadlines, require SLDC LGBR inputs, stakeholder consultation and web publication (pp3-4). Regulation 6.3 substitutes the Sardar Sarovar Project scheduling procedure (p5). Regulation 6.4 updates metering/accounting terminology, treats regional entities as notional control areas with day-ahead drawal schedules and UI pricing, adjusts frequency thresholds, and links infirm power treatment to CERC connectivity and UI regulations (pp5-6). Regulation 6.5 replaces forced-outage schedule revision rules for generating stations of 100 MW or more selling under short-term bilateral transactions, adds pro-rata reduction across transactions, and revises wind scheduling revision rules (pp6-7).

Section 12 amends Annexure-1's complementary commercial mechanism, including wind schedule revisions, deletion of illustrative-calculation wording, quarterly audit of UI, reactive energy and congestion charge accounts, and inter-regional scheduling interface wording (pp6-7). Section 13 deletes the Appendix to the Principal Regulations (p8). The Note records the Principal Regulations' gazette notification on 28.4.2010, an addendum on 3.7.2010 and a corrigendum on 19.1.2011 (p8). A proviso makes the trader/other-agency forced-outage revision provisions operative from 1 July 2012 (p6).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Deviation settlement (DSM)

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.