CERC · Central Electricity Regulatory Commission

IEGC (Fourth Amendment) Regulations, 2016 — Regulation 6.3B Commencement Notification, 2017

Notification – IEGC (Fourth Amendment) Regulations, 2016

AmendmentDated 5 May 2017No. L-1/18/2010-CERC dated th May, 2017

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Indian Electricity Grid Code Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a single-page CERC notification that fixes the day on which a deferred provision of the Indian Electricity Grid Code starts to operate. The preamble records that the IEGC (Fourth Amendment) Regulations, 2016 were notified in the Gazette on 29.4.2016 (p1); that Regulation 1(2) of those regulations provided that sub-Regulation 6.3B would come into force only on a date the Commission appointed by notification in the official Gazette (p1); and that the Detailed Operating Procedure on reserve shutdown and the mechanism for compensation required under Regulations 6.3B, 6 and 7 had been issued by the Commission by order dated 5.5.2017 (p1). The operative clause then notifies that Regulation 6.3B, together with that Detailed Operating Procedure, comes into force with effect from 15.5.2017 (p1). Nothing about the content of the reserve-shutdown or compensation mechanism is set out here.

Standard name
Grid Code
Primary topics
Grid operation and grid code

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document