CERC · Central Electricity Regulatory Commission
Indian Electricity Grid Code, 2010 — First Amendment, 2012
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2012
Amendment · Gazette copyDated 5 Mar 2012Published in the Gazette 6 Mar 2012In force from 2 Apr 2012No. L-1/18/2010-CERC. dated New Delhi, the 5th March, 2012
Replaced by Indian Electricity Grid Code Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Indian Electricity Grid Code (First Amendment) Regulations, 2012.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's first amendment to the Indian Electricity Grid Code, 2010 — the principal instrument governing operation, scheduling and despatch on the inter-State grid. It was issued on 5 March 2012, gazetted 6 March 2012 (p1, p9) and takes effect from 2 April 2012 (p9), except the trader-related schedule-revision provisions, which are operative only from 1 July 2012 (p14).
Several clauses are terminological or housekeeping: "Metering and data collection" becomes "meter data processing" in two places (p9, p13), a sub-regulation on data collection is deleted (p9), and the Appendix of illustrative calculations is removed (p15).
The technical core tightens grid operation. Under-frequency thresholds are raised in Regulations 5.2 and 5.4.2 (p10–11), and a series of provisions now cross-refer to the CEA (Grid Standards) Regulations, 2010 — maintenance of power system elements, temporary over-voltage and voltage unbalance, islanding schemes and protection systems, restoration from partial/total grid collapse, voltage fluctuation limits, and unique codes for operating instructions (p10–11). A new proviso requires units unable to run in restricted governor mode to run in free governor mode with manual intervention (p10), and the response time in one clause is cut from one week to 24 hours (p11).
Regulation 5.7.4 is rewritten to give the RPC Secretariat responsibility for the annual Load Generation Balance Report and outage plan, with a submission calendar binding SEBs/STUs, transmission licensees, CTU, ISGS, IPPs, MPPs and SLDCs (p11–12). Despatch for the Sardar Sarovar Project follows the Narmada Control Authority procedure (p12–13).
Regulation 6.4 is recast on the notional control area, day-ahead drawal schedules and UI deviation pricing, with new treatment of infirm power during testing (p13–14). Regulation 6.5 and Annexure-1 deal with revision of schedules: forced-outage revisions effective from the fourth time block, pro-rata reduction across transactions, and capped revisions for wind generating stations (p14–15).
Read with this
The regulation
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
Amendments and corrections
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Corrigendum
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Addendum
- Dated 5 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code, 2010 — Second Amendment, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Regulation 6.3B Commencement Notification, 2017
- Dated 5 Sep 2019Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017 — Erratum
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020IEGC Regulations, 2010 — Sixth Amendment, 2019 — Commencement Notification, 2020
- Dated 17 May 2020IEGC Regulations, 2010 — Sixth Amendment — Corrigendum
Commencement notices and reasons
- Dated 18 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Statement of Objects and Reasons
- Dated 6 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012 — Statement of Objects and Reasons
- Dated 6 Apr 2016Indian Electricity Grid Code, 2010 — Fourth Amendment, 2016 — Statement of Reasons
- Dated 13 Apr 2018Indian Electricity Grid Code (5th Amendment), 2017 — Statement of Reasons
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 26 Apr 2010Indian Electricity Grid Code, 2010 — Order directing Gazette publication
- Dated 14 Jan 2011Extension of Date of Operation of Clauses 5 and 7 of Annexure-I, IEGC 2010 — Notification
- Dated 14 Jan 2011Extension of date of operation of Clauses 5 and 7 of Annexure-I, IEGC 2010
- Dated 18 Feb 2011Approval of Detailed Procedure for Implementation of Renewable Regulatory Fund Mechanism under IEGC Regulations, 2010
- Dated 5 May 2017Reserve Shut Down and Compensation Mechanism Order, 2017
- Dated 9 Oct 2019Methodology of Settlement of Accounts for Bilateral Short Term and Collective Transactions during Grid Disturbance — Order
Other copies of these documents (8)
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
- Dated 6 Jan 2014Indian Electricity Grid Code (Second Amendment) Regulations, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Commencement Notification, 2017
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
Earlier drafts
- Dated 12 Aug 2013Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 12 Aug 2013Explanatory memorandum: IEGC (Second Amendment) Regulations, 2013 — Explanatory Memorandum
- Dated 12 Aug 2013Public notice: Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Public Notice — Draft
- Released with the notice dated 31 Mar 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015 — Draft
- Dated 2 Jul 2015Draft Indian Electricity Grid Code Regulations, 2015 — Public Notice
- Dated 2 Jul 2015Indian Electricity Grid Code, 2010 — Fourth Amendment Regulations, 2015 — Draft
- Released with the notice dated 9 Dec 2016Indian Electricity Grid Code, 2010 — Fifth Amendment, 2016
- Dated 9 Dec 2016Public notice: Draft Indian Electricity Grid Code (Fifth Amendment) Regulation, 2016 — Public Notice
- Released with the notice dated 9 Dec 2016Explanatory memorandum: Explanatory Memorandum to the IEGC amendments (spinning reserves, ancillary services, un-requisitioned power)
- Dated 6 Aug 2019Indian Electricity Grid Code, 2010 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.