Indian Electricity Grid Code, 2010 — First Amendment, 2012

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2012

Amendment · Gazette copyDated 5 Mar 2012Published in the Gazette 6 Mar 2012In force from 2 Apr 2012No. L-1/18/2010-CERC. dated New Delhi, the 5th March, 2012

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Indian Electricity Grid Code (First Amendment) Regulations, 2012.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's first amendment to the Indian Electricity Grid Code, 2010 — the principal instrument governing operation, scheduling and despatch on the inter-State grid. It was issued on 5 March 2012, gazetted 6 March 2012 (p1, p9) and takes effect from 2 April 2012 (p9), except the trader-related schedule-revision provisions, which are operative only from 1 July 2012 (p14).

Several clauses are terminological or housekeeping: "Metering and data collection" becomes "meter data processing" in two places (p9, p13), a sub-regulation on data collection is deleted (p9), and the Appendix of illustrative calculations is removed (p15).

The technical core tightens grid operation. Under-frequency thresholds are raised in Regulations 5.2 and 5.4.2 (p10–11), and a series of provisions now cross-refer to the CEA (Grid Standards) Regulations, 2010 — maintenance of power system elements, temporary over-voltage and voltage unbalance, islanding schemes and protection systems, restoration from partial/total grid collapse, voltage fluctuation limits, and unique codes for operating instructions (p10–11). A new proviso requires units unable to run in restricted governor mode to run in free governor mode with manual intervention (p10), and the response time in one clause is cut from one week to 24 hours (p11).

Regulation 5.7.4 is rewritten to give the RPC Secretariat responsibility for the annual Load Generation Balance Report and outage plan, with a submission calendar binding SEBs/STUs, transmission licensees, CTU, ISGS, IPPs, MPPs and SLDCs (p11–12). Despatch for the Sardar Sarovar Project follows the Narmada Control Authority procedure (p12–13).

Regulation 6.4 is recast on the notional control area, day-ahead drawal schedules and UI deviation pricing, with new treatment of infirm power during testing (p13–14). Regulation 6.5 and Annexure-1 deal with revision of schedules: forced-outage revisions effective from the fourth time block, pro-rata reduction across transactions, and capped revisions for wind generating stations (p14–15).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Deviation settlement (DSM)

Read with this

The regulation

Other copies of these documents (8)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.