Indian Electricity Grid Code, 2010 — Third Amendment, 2015 — Draft

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Third Amendment) Regulations, 2015

Draft amendmentReleased with the notice dated 31 Mar 2015

Draft

A proposal that has since been finalised as the Indian Electricity Grid Code, 2010 — Third Amendment, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft CERC notification proposing the Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Third Amendment) Regulations, 2015 (p1). Its number and the day of the month are left blank, and it states only that it will take effect from the date of publication in the Official Gazette (p1). Its single theme is bringing wind and solar generation into the inter-State grid code's scheduling, forecasting and deviation-settlement machinery.

Clause 2 rewrites the description of the Scheduling and Despatch Code (Part 6) so that it expressly covers wind and solar generators scheduled by RLDCs, and explains why (p1). Clause 3 restates the definition of "Pool Account"; clause 4 makes the RPC Secretariat (or another person notified by the Commission) responsible for preparing the monthly Regional Energy Account, weekly deviation charge account, reactive energy account and congestion charge account, including deviation accounts for RLDC-scheduled wind and solar using SLDC/RLDC data (p1–2). Clause 5 requires each RLDC's daily regional grid performance report to cover wind and solar generation and injection (p2).

Clause 6 replaces the earlier three-hourly rescheduling basis and the Renewable Regulatory charge with one-and-half-hourly rescheduling of RLDC-scheduled wind and solar and handling of their deviations through DSM charges (p2). Clause 7 extends the UMPP entry in the scheduling code to wind- and solar-based projects of 500 MW and above, and clause 8 sets out the forecasting framework: mandatory data submission by generators, forecasts by both generator and RLDC, the generator's option to adopt the RLDC forecast (bearing any commercial impact), central engagement of forecasting agencies by RLDCs, and the rules for revising schedules (p2–3).

Clauses 9 to 11 deal with Annexure-1: forecast intervals and the capacity threshold for day-ahead forecasting, deviation charges for RLDC-scheduled wind and solar delinked from frequency and settled under the CERC Deviation Settlement Mechanism Regulations, and deletion of paragraphs 6, 7 and 9 (p3–4). A closing note lists when the Principal Regulations and the first two amendments were published (p4).

Standard name
Grid Code
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Grid operation and grid code

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document