CERC · Central Electricity Regulatory Commission

IEGC (Fourth Amendment) Regulations, 2016 — Commencement Notification, 2017

Gazette – IEGC (Fourth Amendment) Regulations, 2016

Amendment · Gazette copyDated 5 May 2017Published in the Gazette 16 May 2017No. L-1/18/2010-CERC dated 5th May, 2017

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the IEGC (Fourth Amendment) Regulations, 2016 — Regulation 6.3B Commencement Notification, 2017.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short commencement notification rather than a substantive regulation. CERC records that the Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fourth Amendment) Regulations, 2016 were notified on 29.4.2016 in the Gazette of India, Extraordinary (Part-III, Section 4, No. 162), and that Regulation 1(2) of those regulations deferred sub-Regulation 6.3B to a date the Commission would appoint by notification in the official Gazette (p2).

That trigger has now occurred: the Detailed Operating Procedure on reserve shutdown and the mechanism for compensation required under Regulations 6.3B, 6 and 7 was issued by Commission order dated 5.5.2017 (p2).

Accordingly the notification declares that Regulation 6.3B and the Detailed Operating Procedure shall come into force with effect from 15.5.2017 (p2). The notification itself is dated 5 May 2017 and appears in the Gazette of 16 May 2017 (p1–2), so the stated effective date precedes the publication date. Analysts tracking reserve shutdown obligations and the associated compensation mechanism should read this together with the 2016 Fourth Amendment Regulations and the 5.5.2017 procedure order, which are not reproduced here.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Ancillary services and reserves

Read with this

The regulation

Other copies of these documents (8)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document