CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code, 2010 — Fourth Amendment, 2016 — Statement of Reasons

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fourth Amendment) Regulations, 2016

Statement of reasonsDated 6 Apr 2016

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Indian Electricity Grid Code Regulations, 2010 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 30 of 54. Check the regulator's original before you rely on it.

The Statement of Reasons (p1) explains the CERC's decisions on comments received to the draft Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fourth Amendment) Regulations, 2015/2016. The draft was publicised on 2 July 2015, comments were sought, a supplementary draft on inter-State transmission COD followed, and a public hearing was held on 19 August 2015 (p1). The document records stakeholder comments, the Commission's analysis, and the revised amendment text.

The first substantive change expands Regulation 6.2 of the Grid Code so that it also provides for commercial operation, trial operation and technical minimum scheduling for Central generating stations, inter-State generating stations and the inter-State transmission system (pp2–4). The Commission keeps State generating stations out of the COD mechanism and says renewable-energy COD provisions may come later; combined-cycle plants are treated as thermal (pp3–4).

The core is proposed Regulation 6.3A for thermal, hydro and pumped-storage stations: how COD is declared after a trial run and RLDC/SLDC clearance, what the generating company must certify, how partial loading, interruptions, de-rating and repeat trial are handled, and when scheduling begins (pp4–18). Related sections deal with trial-run duration and load-pickup capability (pp9–12), technical certification (pp12–14), information flow to RPCs (p14), the start of COD (p14) and prior notice for trial and repeat trial (pp14–15).

The final part (pp18–30) takes up COD for transmission and communication systems, trial charging, pre-required elements, and objections from Adani, Sterlite, POWERGRID and NLDC. The Commission explains its statutory basis, protects the Tariff Regulations 2014 and TSA positions for TBCB projects, and discusses the Ministry of Power early-commissioning incentive and its 28 January 2016 order. The full document runs to page 54.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Technical standards

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document