Skip to content

CERC · Central Electricity Regulatory Commission

Extension of date of operation of Clauses 5 and 7 of Annexure-I, IEGC 2010

Extension of date of operation of Clauses 5 and 7 of Annexure-I, IEGC 2010 - Gazette

OrderDated 14 Jan 2011Published in the Gazette 19 Jan 2011No. L-1/18/2010-CERC dated 14th January, 2011

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Indian Electricity Grid Code Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page CERC gazette notification that pushes back the start date of two provisions of the Indian Electricity Grid Code. The Commission records that the IEGC Regulations, 2010 were notified on 28-4-2010 and came into force on 3-5-2010, except for provisions given separate commencement dates (p1–2). Clauses (5) and (7) of Annexure-I had been assigned 1-1-2011. Because the procedures and mechanisms those clauses require had not yet been finalised, the Commission — acting under clause (1) of Part 7 of the IEGC Regulations themselves — has fixed 1-1-2012 instead, and notifies all concerned accordingly (p1–2). Nothing else in the Grid Code is touched; the notification changes only the commencement date of those two clauses. Page 2 repeats the page 1 text verbatim as the signed notification.

Standard name
Grid Code
Primary topics
Grid operation and grid code

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document