Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fourth Amendment) Regulations, 2016

Amendment · Gazette copyDated 6 Apr 2016Published in the Gazette 29 Apr 2016No. L-1/18/2010-CERC dated the 6th April, 2016

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the CERC's Fourth Amendment to the Indian Electricity Grid Code Regulations, 2010, issued 6 April 2016 (p7) and published in the Gazette of India, Extraordinary, Part III—Section 4 on 29 April 2016 (p1). Short in form, it writes two new sub-chapters into the Grid Code.

Paragraphs 1–4 (p7) give the title and commencement and amend the Principal Regulations structurally: three new definitions are inserted into Regulation 2 — Date of Commercial Operation, Trial Operation/Trial Run and Technical Minimum Schedule — and the list of matters the Code covers under Regulations 6.1 and 6.2 is extended to cover declaration of commercial operation and technical minimum scheduling.

New Regulation 6.3A (pp7–10) sets the procedure and demonstration tests for declaring commercial operation: thermal CGS/ISGS units (capacity demonstration, beneficiary notice, RLDC/SLDC clearance and its timelines, CMD/CEO/MD certification, Board approval, de-rating option); hydro including pumped storage (peaking capability, with carve-outs where reservoir level or lean inflows prevent demonstration, and mandatory later demonstration); inter-State transmission systems (regular service after trial operation, TBCB/Transmission Service Agreement route, dedicated lines, matched commissioning, CEA monitoring, and applications to the Commission where delays lie with others); communication systems; trial-run durations for each asset class; and a precedence rule over the Tariff Regulations, 2014 on inconsistency.

New Regulation 6.3B (pp10–12) creates the technical minimum schedule for CGS/ISGS units, empowers the RLDC to direct operation between the technical minimum and normative availability for grid security, and lays out the compensation framework for low unit loading — station heat rate and auxiliary consumption degradation bands, start-up oil norms, reserve shut down, gas-station characteristic curves — with monthly claims, annual reconciliation and exclusions. It requires non-Commission-tariff generators to reflect the regime in their PPAs, annual emission reporting, a Detailed Operating Procedure from NLDC, and compensation mechanisms from the RPCs. The closing Note (p12) records the Gazette details of the Principal Regulations and the first three amendments.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch

Read with this

The regulation

Other copies of these documents (8)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.