CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Draft

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Second Amendment) Regulations, 2013

Draft amendmentDated 12 Aug 2013No. L-1/18/2010-CERC dated 12th August, 2013

Draft

A proposal that has since been finalised as the Indian Electricity Grid Code, 2010 — Second Amendment, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft text of a CERC notification, dated 12 August 2013 and numbered No. L-1/18/2010-CERC, that would make the Indian Electricity Grid Code (Second Amendment) Regulations, 2013. It amends the CERC (Indian Electricity Grid Code) Regulations, 2010 — whose notification, addendum, corrigendum and First Amendment are recited in the closing Note (p8) — and is made under section 79(1)(h) read with section 178(2)(g) of the Electricity Act, 2003. It is to take effect on publication in the official Gazette (p1).

Clause 2 adds three definitions to Regulation 2 of the principal regulations — coordinating agency, pooling station and reference rate — building the vocabulary for pooled wind and solar connection (p1–2). Clause 3 amends Regulation 5, deleting the frequency-contingent triggers from the despatch and demand-management sub-regulations, narrowing the frequency band carried in one sub-regulation, and replacing the RLDC direction sub-regulation with a duty to issue standard instantaneous message formats and to receive compliance reports (p2).

Clause 4 is the bulk of the document, rewriting Regulation 6 on scheduling and despatch: notional control areas and day-ahead drawal schedules, pricing of inadvertent deviation through the Deviation Settlement Mechanism, restrictions on state net drawal, revised treatment of ISGS deviation, deletion of three sub-regulations, contingency directions by RLDC and the order in which open access is curtailed, hydro scheduling, deemed revision of schedules on grid disturbance with provisos for region-specific events, the wind scheduling and forecasting regime (with effect from 15.7.2013), and rounding conventions for availability and schedules (p3–6).

Clause 5 amends Annexure 1, the Complementary Commercial Mechanism, setting forecasting and scheduling at pooling-station level, identifying the coordinating agency and its functions, cost sharing, the trigger for pooling stations that grow into the capacity threshold, and the basis of the Reference Rate for Renewable Regulatory Fund computations (p6–8). The amendments pass compliance limits and deviation pricing to the Commission's Deviation Settlement Mechanism and Congestion Charge Regulations rather than fixing them here.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Deviation settlement (DSM)

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page