Skip to content

CERC · Central Electricity Regulatory Commission

Approval of Detailed Procedure for Implementation of Renewable Regulatory Fund Mechanism under IEGC Regulations, 2010

Approval of detailed "Procedure for the Implementation of the Mechanism of Renewable Regulatory Fund" under Regulation 6.1 (d) of Central Electricity Regulatory Commission (Indian Electricity Grid Code), Regulation 2010.

ProcedureDated 18 Feb 2011In force from 1 Jan 2012No. L-1/18/2010-CERC dated 18-2-2011

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Indian Electricity Grid Code Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's approval, dated 18-2-2011, of the detailed procedure that makes the Renewable Regulatory Fund (RRF) work. The Commission's Indian Electricity Grid Code Regulations, 2010 had required NLDC, under Regulation 6.1(d) read with Clause 9 of Annexure I (the Complementary Commercial Mechanism), to draft the procedure and submit it for approval (p1). NLDC submitted its draft on 30 November 2010, and the Commission approves it as the Annexure to this order (pp1–2).

The annexed procedure (pp3–9) first fixes who it binds: wind farms of 10 MW and above and solar plants of 5 MW and above connected at 33 kV and above, and which had not signed a PPA with states/UTs/DVC or others when IEGC 2010 took effect, subject to a declaration route through SLDC to RPC, RLDC and NLDC (p3). It excludes plants selling through collective transactions (p4). General conditions route scheduling, metering, energy accounting and UI charging to the Commission's other regulations, and set out metering, data-acquisition and anti-gaming duties for licensees and load despatch centres (p4).

The core is the fund and the settlement mechanics. It establishes the RRF at national level, maintained and operated by NLDC on the lines of the regional UI pool account (p4–5). It sets how wind deviation is split between generator and host state around a permitted forecasting band, how over-generation beyond a ceiling is treated from a grid-security standpoint, and how intra-state and inter-state sales of wind and solar are settled, including compensation flows to and from the host state (pp5–7). Solar generators are given a different, scheduler-vetted regime with no UI on the generator (p6). Energy accounting is weekly, with SLDC/RLDC/RPC duties, a Thursday data cycle and 15-day windows for verification (pp7–8). Payment terms, priority, interest on delay, order of appropriation, pro-rata shortfall handling and maintenance of separate principal and interest books are set in Section 9 (pp8–9). Removal of difficulties leaves revision to NLDC with Commission approval (p9).

The Appendix (pp10–23) works through numerical cases: intra-state and inter-state wind settlements across five deviation scenarios each, and intra-state and inter-state solar cases.

Standard name
Grid Code
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.