Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code (5th Amendment), 2017 — Statement of Reasons

Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations (5th Amendment), 2017

Statement of reasonsDated 13 Apr 2018File No. L-1/18/2010-CERC dated 13th April, 2018

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Indian Electricity Grid Code Regulations, 2010 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 41 of 82. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons for the Fifth Amendment to the Indian Electricity Grid Code. The Commission issued the draft amendment and an explanatory memorandum on 9 December 2016, received comments from 19 stakeholders and held a public hearing on 28.2.2017, then notified the Fifth Amendment on 12.4.2017; this Statement of Reasons, dated 13 April 2018, records the comments received and the Commission's reasoning decision by decision (p1–2).

Paras 2–8 cover definitions and institutional roles. CERC substitutes the definition of "Spinning Reserves" in Regulation 2(1)(sss), declining to name battery storage or other devices because "devices" is already wide enough, and rejects narrowing the definition with "unused"; questions of response time, non-spinning reserves and primary/secondary/tertiary reserve definitions are pushed to the Detailed Procedure for implementation of Spinning Reserve (p2–6). Regulation 2(2) is replaced so undefined terms follow the Act or other CERC regulations (p6–7), Part 1's scope is widened to ancillary reserve services, un-requisitioned surplus and spinning reserves (p7), and Part 2 assigns new functions to NLDC, RLDCs and RPCs, with the proposed SLDC clause dropped as already covered by Regulation 5.3 (p7–10).

Paras 9–14 amend Part 5 on governor response: they reset the class of units obliged to provide primary response, defer the gas-station obligation by six months, tighten the no-reduction frequency band, retain a primary-response expectation expressed as a percentage of generation level, cap scheduling at ex-bus generation corresponding to installed capacity, bar valve-wide-open operation, carve out hydro in high inflow and part-load conditions, and add two-yearly third-party governor testing at generator cost (p10–37).

Para 15 replaces the day-ahead timeline in Regulation 6.5 with two-day-ahead scheduling to give effect to the Tariff Policy of 28.1.2016 on selling un-requisitioned surplus, covering the order of requisition, market sale, the no-recall rule and sharing of gains (p37–41).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Ancillary services and reserves, Scheduling and despatch

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document