Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fifth Amendment) Regulations, 2017

AmendmentDated 12 Apr 2017In force from 1 May 2017No. L-1/18/2010-CERC dated 12th April, 2017

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Indian Electricity Grid Code Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fifth Amendment to the CERC (Indian Electricity Grid Code) Regulations, 2010, issued 12 April 2017 and brought into force on 1 May 2017 (p1). It re-writes or inserts provisions across several parts of the Principal Regulations to give grid-level effect to Ancillary Services — particularly Spinning Reserves and the use of Unrequisitioned Surplus (URS) — and to tighten primary frequency response obligations on generators.

The General Part is touched first: the definition of "Spinning Reserve" is substituted, and the residual interpretive clause is reworded to point at the Act and other CERC regulations (p1–2). Part 1 is extended so that its scheduling and despatch scope expressly covers Ancillary Reserve Services, URS utilisation and Spinning Reserves, and the information flow among generating stations, NLDC, RLDCs, power exchanges and SLDCs (p2). Part 2 makes NLDC the nodal agency for collective transactions and Ancillary Services, adds a coordination function for RLDCs/SLDCs/RPCs in implementing ancillary services and identifying spinning reserves at inter-State level, and adds RLDC/SLDC functions covering operation of ancillary services and maintenance of energy accounts (p2–3).

Part 5 is the operational core. The class of units obliged to provide frequency response is redefined by technology and size — coal/lignite thermal, larger open-cycle/combined-cycle gas stations, and hydro — with the hydro threshold raised (p3). A staged date is set for the gas category. The primary-response clause is replaced with a no-reduction-below-nominal-frequency rule and a droop-based increase up to a ceiling of unit capability (p4), the capability clause now differentiates the instant pick-up percentage by technology, and a new provision bars RLDCs/SLDCs from scheduling beyond ex-bus generation at 100% of installed capacity and bars generators from valve-wide-open operation so a governor margin is preserved, with carve-outs for hydro spillage avoidance and for VWO margin in ancillary scheduling (p5). A proviso adds two-yearly independent third-party testing of governor/response capability, cost-recoverable from generators (p5).

Part 6 changes despatch and market timelines — earlier submission hours and a correction of wording — and inserts clauses governing how an original beneficiary consents to its ISGS selling its share in the market, on a standing or daily basis, and how the resulting gains are shared (p6–7). A new Regulation 6.5(A) sets out the framework for scheduling and commercial settlement of energy exchanged under ancillary services, spinning reserves and URS, cross-referring to the 2015 Ancillary Services Regulations and to a Detailed Procedure to be notified separately by the Commission in consultation with POSOCO (NLDC), and allocating gains between ISGS and beneficiary while protecting the beneficiary from adverse energy-charge impact and leaving fixed charges with the beneficiary (p7–8). A closing note lists the earlier corrigenda, addenda and first-to-fourth amendments to the Principal Regulations (p8).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Ancillary services and reserves, Scheduling and despatch

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗