CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code, 2010 — Third Amendment, 2015

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Third Amendment) Regulations, 2015

AmendmentDated 7 Aug 2015In force from 1 Nov 2015No. 1/14/2015-Reg.Aff.(FSDS)(i)/CERC dated 7 th August, 2015

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Indian Electricity Grid Code Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission's (Indian Electricity Grid Code) (Third Amendment) Regulations, 2015 — notification No. 1/14/2015-Reg.Aff.(FSDS)(i)/CERC, New Delhi, 7 August 2015 — rewrite the grid code's treatment of wind and solar generation. They take effect on 1 November 2015 (p1).

The amendment recasts the description of Part 6, the Scheduling and Despatch Code, so that it covers wind and solar generators that are regional entities alongside ISGS and long-term, medium-term and short-term open access transactions (p1); redefines "Pool Account" to cover Deviation Charge, Reactive Energy and Congestion Charge accounts (p1–2); makes the RPC Secretariat prepare the monthly Regional Energy Account, weekly deviation charge account and separate deviation accounts for wind and solar regional entities (p2); and requires each RLDC's daily regional grid report to cover wind and solar generation (p2).

Operationally it replaces three-hourly re-scheduling and the Renewable Regulatory charge mechanism with one-and-a-half-hourly re-scheduling and deviation handling for regional wind and solar generators, settled under the DSM Regulations 2014 (p2, p4). Regulation 6.5(23) is substituted with rules on mandatory technical and weather data reporting to RLDC, parallel forecasting by generator and RLDC with the generator bearing the commercial impact of its chosen forecast, schedule revision windows effective from the 4th time block (up to 16 revisions a day), and solar scheduling based on availability and irradiance (p3). Annexure-1 is amended to require day-ahead forecasts at 15-minute intervals for aggregate capacity of 50 MW and above (p3); paragraphs 6, 7 and 9 of that annexure are deleted (p4). The Ultra Mega Power Project category is widened to include wind and solar projects of 500 MW and above (p2).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Deviation settlement (DSM)

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.