Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code Regulations, 2010 — Addendum

Addendum (28-06-2010)

CorrigendumDated 28 Jun 2010No. L-1/18/2010-CERC dated 28th June, 2010

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Corrects the Indian Electricity Grid Code Regulations, 2010 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This one-page addendum from the Central Electricity Regulatory Commission, dated 28 June 2010, corrects the CERC (Indian Electricity Grid Code) Regulations, 2010 (p1). It directs that after sub-clause (18) of clause (5) of Regulation 6, at page 128 of the principal regulations, a new sub-clause 6.5.18(a) be added (p1). The inserted text provides that, notwithstanding Regulation 6.5.18, when a unit suffers a forced outage at a station with a two-part tariff based on capacity charge and energy charge for long-term and medium-term contracts, the RLDC must revise the schedule using the revised declared capability (p1). The revised declared capability and schedules take effect from the fourth time block, counting the time block in which the ISGS advises the revision as the first (p1). A note records that the principal regulations were published on 28.4.2010 in Part III-Section 4 of G.I. No.115 (p1). The addendum states no commencement date of its own.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document