Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fifth Amendment) Regulations, 2017

Amendment · Gazette copyDated 12 Apr 2017In force from 1 May 2017No. L-1/18/2010-CERC dated 12th April, 2017

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fifth Amendment to CERC's Indian Electricity Grid Code Regulations, 2010, notified on 12 April 2017 (p5) and brought into force from 1 May 2017 (p5). Its main work is to build ancillary services — spinning reserves and un-requisitioned surplus (URS) — into the grid code, and to tidy up several primary-response and scheduling provisions.

Regulation 2 replaces the definition of 'Spinning Reserve' in the General Part and substitutes the residual definitions clause (p5). Regulation 3 widens Part 1's scope so that scheduling and despatch of ISGS power also covers ancillary reserve services, URS utilisation and spinning reserves, including the information flow between generators, NLDC, RLDCs, power exchanges and SLDCs (p5–6). Regulation 4 makes NLDC the nodal agency for collective transactions and ancillary services, adds coordination duties with ISGSs, RPCs and SLDCs, and adds accounting functions tied to the CERC (Ancillary Services Operation) Regulations, 2015 (p6).

Regulation 5 reworks Part 5's primary-response regime. It resets which units are covered by fuel type and size, with gas stations phased in from 1 October 2017 (p6). It rewrites the frequency-response obligations, bars scheduling above 100% of installed capacity and valve-wide-open operation, protects hydro stations during high inflow, and prescribes two-yearly third-party testing paid for by generators (p6–7).

Regulation 6 changes Part 6 cut-off times, creates a daily consent mechanism for an ISGS selling a beneficiary's power in the market, and allows estimated restoration time to be revised once a day (p7). Regulation 7 inserts a new Regulation 6.5(A) on scheduling and commercial settlement of ancillary services, spinning reserves and URS, deferring the spinning-reserve procedure to a separate Detailed Procedure with POSOCO (NLDC) and setting out default gain-sharing and protections for beneficiaries (p7–8). A closing Note lists the Principal Regulations and their earlier corrigendum, addendum and first-to-fourth amendments (p8).

Standard name
Grid Code
Primary topics
Ancillary services and reserves, Grid operation and grid code, Scheduling and despatch

Read with this

The regulation

Other copies of these documents (8)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document