CERC · Central Electricity Regulatory Commission
Indian Electricity Grid Code (Second Amendment) Regulations, 2014
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Second Amendment) Regulations, 2014
Amendment · Gazette copyDated 6 Jan 2014In force from 17 Feb 2014No. L-1/18/2010-CERC dated 6th January, 2014
Replaced by Indian Electricity Grid Code Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Indian Electricity Grid Code, 2010 — Second Amendment, 2014.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Second Amendment) Regulations, 2014, issued by CERC on 6 January 2014 under s.79(1)(h) read with s.178(2)(g) of the Electricity Act, 2003, amends the CERC (Indian Electricity Grid Code) Regulations, 2010 and its first amendment (together "the Principal Regulations"). It comes into force on 17-2-2014 (p1).
Regulation 2 inserts new definitions into Regulation 2 of the Principal Regulations — including the Deviation Settlement Mechanism Regulations and a definition of "Pooling Station", with a proviso covering wind/solar generators connected through common feeders and terminating at a discom/STU/CTU sub-station (p1–2).
Regulation 3 rewrites frequency-response provisions in Regulation 5: it restates the primary response requirement on frequency fall, deletes several low-frequency triggers (49.8 Hz, 49.7 Hz) from the demand-management sub-regulations, changes the frequency dead-band figures in Regulation 5.2(m), and substitutes Regulation 5.4.2(g) so RLDCs devise standard instantaneous message formats for contingency directions, backed by compliance reporting (p2).
Regulation 4 is the bulk and substitutes numerous sub-regulations of Regulation 6 on scheduling and despatch: notional control areas and drawal schedules (6.4.6), restriction of net drawal and use of automatic/manual demand management (6.4.7), ISGS deviation limits (6.4.10), deletion of 6.4.11 and 6.4.15, RLDC contingency directions and curtailment ordering (6.4.12), hydro scheduling (6.4.24, 6.5.13), deemed revision of schedules on grid disturbance and NPC settlement methodology (6.5.17), revision of declared capability (6.5.18), wind scheduling thresholds and revision windows (6.5.23), and rounding resolutions for availability, entitlements and schedules (6.5.34) (p2–4).
Paragraph 5 of Annexure-1 (Complimentary Commercial Mechanism) is substituted: wind generators forecast their generation, bear UI charges outside the deviation band, and the host state bears deviation charges within it, shared nationally through a Renewable Regulatory Charge operated via a Renewable Regulatory Fund — applicable from a date to be notified by the Commission (p4).
Read with this
The regulation
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
Amendments and corrections
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Corrigendum
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Addendum
- Dated 5 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code, 2010 — Second Amendment, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Regulation 6.3B Commencement Notification, 2017
- Dated 5 Sep 2019Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017 — Erratum
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020IEGC Regulations, 2010 — Sixth Amendment, 2019 — Commencement Notification, 2020
- Dated 17 May 2020IEGC Regulations, 2010 — Sixth Amendment — Corrigendum
Commencement notices and reasons
- Dated 18 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Statement of Objects and Reasons
- Dated 6 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012 — Statement of Objects and Reasons
- Dated 6 Apr 2016Indian Electricity Grid Code, 2010 — Fourth Amendment, 2016 — Statement of Reasons
- Dated 13 Apr 2018Indian Electricity Grid Code (5th Amendment), 2017 — Statement of Reasons
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 26 Apr 2010Indian Electricity Grid Code, 2010 — Order directing Gazette publication
- Dated 14 Jan 2011Extension of Date of Operation of Clauses 5 and 7 of Annexure-I, IEGC 2010 — Notification
- Dated 14 Jan 2011Extension of date of operation of Clauses 5 and 7 of Annexure-I, IEGC 2010
- Dated 18 Feb 2011Approval of Detailed Procedure for Implementation of Renewable Regulatory Fund Mechanism under IEGC Regulations, 2010
- Dated 5 May 2017Reserve Shut Down and Compensation Mechanism Order, 2017
- Dated 9 Oct 2019Methodology of Settlement of Accounts for Bilateral Short Term and Collective Transactions during Grid Disturbance — Order
Other copies of these documents (8)
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
- Dated 5 Mar 2012Indian Electricity Grid Code, 2010 — First Amendment, 2012
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Commencement Notification, 2017
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
Earlier drafts
- Dated 12 Aug 2013Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 12 Aug 2013Explanatory memorandum: IEGC (Second Amendment) Regulations, 2013 — Explanatory Memorandum
- Dated 12 Aug 2013Public notice: Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Public Notice — Draft
- Released with the notice dated 31 Mar 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015 — Draft
- Dated 2 Jul 2015Draft Indian Electricity Grid Code Regulations, 2015 — Public Notice
- Dated 2 Jul 2015Indian Electricity Grid Code, 2010 — Fourth Amendment Regulations, 2015 — Draft
- Released with the notice dated 9 Dec 2016Indian Electricity Grid Code, 2010 — Fifth Amendment, 2016
- Dated 9 Dec 2016Public notice: Draft Indian Electricity Grid Code (Fifth Amendment) Regulation, 2016 — Public Notice
- Released with the notice dated 9 Dec 2016Explanatory memorandum: Explanatory Memorandum to the IEGC amendments (spinning reserves, ancillary services, un-requisitioned power)
- Dated 6 Aug 2019Indian Electricity Grid Code, 2010 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.