CERC · Central Electricity Regulatory Commission
Indian Electricity Grid Code Regulations, 2010
Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010
RegulationDated 28 Apr 2010In force from 3 May 2010No. L-1/18/2010-CERC dated 28th April 2010
Replaced by Indian Electricity Grid Code Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”
Summary
Summary written by software, from pages 1 to 36 of 77. Check the regulator's original before you rely on it.
The document is CERC's Indian Electricity Grid Code, 2010, issued in New Delhi on 28 April 2010 and expressed to come into force on 3 May 2010, superseding the Indian Electricity Grid Code, 2006 (p1). It is a principal regulation under Electricity Act 2003 s.79(1)(h) read with s.178(2)(g), and is framed as a single set of technical and commercial rules for all users of the inter-State transmission system, the National and Regional grids, and the load despatch and planning institutions around them (pp10-11).
The notification and short-title, extent and commencement clauses occupy p1. Pages 1-9 are the definitions section, defining grid-operation, scheduling, access and institutional terms such as user, beneficiary, ISGS, ISTS, ATC, ex-power plant, governor droop, regional entity and unscheduled interchange.
Part 1 (pp10-14) sets the IEGC's objective and structure, identifies the entities bound, gives special treatment to DVC, BBMB and SSP, treats an interconnected neighbouring country as a separate control area, and creates compliance oversight: RLDCs and RPCs monitor and report non-compliance, any person may petition CERC, and CERC may act suo motu (pp13-14).
Part 2 (pp15-22) describes the roles and linkages of NLDC, RLDC, RPC, CTU, CEA, SLDC and STU, largely restating their statutory functions and designating nodal agencies for collective transactions, short-term open access, connectivity/long-term access/medium-term open access, energy accounting and transmission availability certification.
Part 3 (pp23-28) is the Planning Code for inter-State transmission: planning objectives and scope, planning process, reliance on CEA perspective plans, Electric Power Survey and transmission planning criteria, planning data exchange, planning criteria for contingency outages and reactive compensation, and implementation through the CERC connectivity/access regulations.
Part 4 (pp29-31) is the Connection Code: procedure and agreement for new or modified ISTS connection, minimum technical requirements for reactive power compensation, data and communication facilities, system recording instruments, safety responsibilities, cyber security framework, international connections and annual asset schedules.
Part 5 begins on p32 and is the Operating Code. The supplied text covers operating philosophy, system security, restrictions on deliberate isolation or opening of important grid elements, reporting of trippings and outages, governor action and restricted governor mode for large thermal and hydro units, limits on suppressing governor action, AVR/PSS obligations, protection coordination and under-frequency/df/dt load shedding. The content list at pp12-13 shows Part 5 also covers demand estimation, demand management, periodic reports, operational liaison, outage planning, recovery procedures and event reporting. Part 6 is to cover day-ahead and intra-day scheduling, open-access transactions and renewable wind/solar scheduling. The full document is 77 pages.
Read with this
Amendments and corrections
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Corrigendum
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Addendum
- Dated 5 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code, 2010 — Second Amendment, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Regulation 6.3B Commencement Notification, 2017
- Dated 5 Sep 2019Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017 — Erratum
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020IEGC Regulations, 2010 — Sixth Amendment, 2019 — Commencement Notification, 2020
- Dated 17 May 2020IEGC Regulations, 2010 — Sixth Amendment — Corrigendum
Commencement notices and reasons
- Dated 18 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Statement of Objects and Reasons
- Dated 6 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012 — Statement of Objects and Reasons
- Dated 6 Apr 2016Indian Electricity Grid Code, 2010 — Fourth Amendment, 2016 — Statement of Reasons
- Dated 13 Apr 2018Indian Electricity Grid Code (5th Amendment), 2017 — Statement of Reasons
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 26 Apr 2010Indian Electricity Grid Code, 2010 — Order directing Gazette publication
- Dated 14 Jan 2011Extension of Date of Operation of Clauses 5 and 7 of Annexure-I, IEGC 2010 — Notification
- Dated 14 Jan 2011Extension of date of operation of Clauses 5 and 7 of Annexure-I, IEGC 2010
- Dated 18 Feb 2011Approval of Detailed Procedure for Implementation of Renewable Regulatory Fund Mechanism under IEGC Regulations, 2010
- Dated 5 May 2017Reserve Shut Down and Compensation Mechanism Order, 2017
- Dated 9 Oct 2019Methodology of Settlement of Accounts for Bilateral Short Term and Collective Transactions during Grid Disturbance — Order
Other copies of these documents (9)
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
- Dated 5 Mar 2012Indian Electricity Grid Code, 2010 — First Amendment, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code (Second Amendment) Regulations, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Commencement Notification, 2017
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
Earlier drafts
- Dated 12 Aug 2013Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 12 Aug 2013Explanatory memorandum: IEGC (Second Amendment) Regulations, 2013 — Explanatory Memorandum
- Dated 12 Aug 2013Public notice: Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Public Notice — Draft
- Released with the notice dated 31 Mar 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015 — Draft
- Dated 2 Jul 2015Draft Indian Electricity Grid Code Regulations, 2015 — Public Notice
- Dated 2 Jul 2015Indian Electricity Grid Code, 2010 — Fourth Amendment Regulations, 2015 — Draft
- Released with the notice dated 9 Dec 2016Indian Electricity Grid Code, 2010 — Fifth Amendment, 2016
- Dated 9 Dec 2016Public notice: Draft Indian Electricity Grid Code (Fifth Amendment) Regulation, 2016 — Public Notice
- Released with the notice dated 9 Dec 2016Explanatory memorandum: Explanatory Memorandum to the IEGC amendments (spinning reserves, ancillary services, un-requisitioned power)
- Dated 6 Aug 2019Indian Electricity Grid Code, 2010 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.