Indian Electricity Grid Code, 2010 — Fifth Amendment, 2016

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fifth Amendment) Regulations, 2016

Draft amendmentReleased with the notice dated 9 Dec 2016No. L-I/18/2016-CERC

Draft

A proposal that has since been finalised as the Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fifth Amendment to the CERC (Indian Electricity Grid Code) Regulations, 2010, notified by the Central Electricity Regulatory Commission under s.79(1)(h) read with s.178(2)(g) of the Electricity Act, 2003 (p1). It comes into force on publication in the Official Gazette (p1) and rewrites the Grid Code's treatment of ancillary services, spinning reserves and un-requisitioned surplus (URS) power.

Paragraph 2 replaces the definition of 'Spinning Reserves' with a system-operator-activated capacity definition and restates the residual definitions clause (p1). Paragraph 3 extends Part 1's scheduling and despatch scope to ISGS power used for Ancillary Reserve Services, URS utilisation and spinning reserves, listing the information-flow participants from generating stations through NLDC, RLDCs, power exchanges and SLDCs (p2). Paragraph 4 adds ancillary-services duties and coordination responsibilities to the organisations addressed in Part 2, including NLDC's role as nodal agency for collective transactions and ancillary services, and accounting of the energy transacted (p2–3).

Paragraph 5 resets the class of generating units subject to Part 5's frequency-response and primary-response provisions — coal/lignite thermal units of 200 MW and above, open-cycle gas turbine/combined-cycle stations with gas turbines above 50 MW each, and hydro units of 25 MW and above — with the gas category deferred to 01.04.2017 (p3). It also tightens primary response: no turndown when frequency improves marginally, droop-based increase up to a ceiling relative to MCR, instantaneous pick-up obligations, and a bar on scheduling beyond ex-bus generation corresponding to 100% of installed capacity and on valve-wide-open operation, with a proviso that the VWO margin cannot be used to schedule ancillary services (p3–5).

Paragraph 6 rewrites the two-day-ahead despatch sequence in Regulation 6.5 — ISGS capability advice, entitlement compilation, SLDC review, RLDC dispatch and net drawal schedules, URS declaration and requisition windows, market sale of balance URS and its irreversibility, and a limit on schedule revisions (p5–7). Paragraph 7 inserts new Regulation 6.5(A) governing scheduling and commercial settlement of energy exchanged under ancillary services, spinning reserves and URS, including reallocation of charges and sharing of market-sale gains between generator and original beneficiary (p7–8).

Standard name
Grid Code
Primary topics
Ancillary services and reserves, Scheduling and despatch, Grid operation and grid code

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document