CERC · Central Electricity Regulatory Commission
Indian Electricity Grid Code, 2010 — Fifth Amendment, 2016
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fifth Amendment) Regulations, 2016
Draft amendmentReleased with the notice dated 9 Dec 2016No. L-I/18/2016-CERC
Draft
A proposal that has since been finalised as the Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fifth Amendment to the CERC (Indian Electricity Grid Code) Regulations, 2010, notified by the Central Electricity Regulatory Commission under s.79(1)(h) read with s.178(2)(g) of the Electricity Act, 2003 (p1). It comes into force on publication in the Official Gazette (p1) and rewrites the Grid Code's treatment of ancillary services, spinning reserves and un-requisitioned surplus (URS) power.
Paragraph 2 replaces the definition of 'Spinning Reserves' with a system-operator-activated capacity definition and restates the residual definitions clause (p1). Paragraph 3 extends Part 1's scheduling and despatch scope to ISGS power used for Ancillary Reserve Services, URS utilisation and spinning reserves, listing the information-flow participants from generating stations through NLDC, RLDCs, power exchanges and SLDCs (p2). Paragraph 4 adds ancillary-services duties and coordination responsibilities to the organisations addressed in Part 2, including NLDC's role as nodal agency for collective transactions and ancillary services, and accounting of the energy transacted (p2–3).
Paragraph 5 resets the class of generating units subject to Part 5's frequency-response and primary-response provisions — coal/lignite thermal units of 200 MW and above, open-cycle gas turbine/combined-cycle stations with gas turbines above 50 MW each, and hydro units of 25 MW and above — with the gas category deferred to 01.04.2017 (p3). It also tightens primary response: no turndown when frequency improves marginally, droop-based increase up to a ceiling relative to MCR, instantaneous pick-up obligations, and a bar on scheduling beyond ex-bus generation corresponding to 100% of installed capacity and on valve-wide-open operation, with a proviso that the VWO margin cannot be used to schedule ancillary services (p3–5).
Paragraph 6 rewrites the two-day-ahead despatch sequence in Regulation 6.5 — ISGS capability advice, entitlement compilation, SLDC review, RLDC dispatch and net drawal schedules, URS declaration and requisition windows, market sale of balance URS and its irreversibility, and a limit on schedule revisions (p5–7). Paragraph 7 inserts new Regulation 6.5(A) governing scheduling and commercial settlement of energy exchanged under ancillary services, spinning reserves and URS, including reallocation of charges and sharing of market-sale gains between generator and original beneficiary (p7–8).
Read with this
The regulation
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
Amendments and corrections
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Corrigendum
- Dated 28 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Addendum
- Dated 5 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code, 2010 — Second Amendment, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Regulation 6.3B Commencement Notification, 2017
- Dated 5 Sep 2019Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017 — Erratum
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020IEGC Regulations, 2010 — Sixth Amendment, 2019 — Commencement Notification, 2020
- Dated 17 May 2020IEGC Regulations, 2010 — Sixth Amendment — Corrigendum
Commencement notices and reasons
- Dated 18 Jun 2010Indian Electricity Grid Code Regulations, 2010 — Statement of Objects and Reasons
- Dated 6 Mar 2012Indian Electricity Grid Code (First Amendment) Regulations, 2012 — Statement of Objects and Reasons
- Dated 6 Apr 2016Indian Electricity Grid Code, 2010 — Fourth Amendment, 2016 — Statement of Reasons
- Dated 13 Apr 2018Indian Electricity Grid Code (5th Amendment), 2017 — Statement of Reasons
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 26 Apr 2010Indian Electricity Grid Code, 2010 — Order directing Gazette publication
- Dated 14 Jan 2011Extension of Date of Operation of Clauses 5 and 7 of Annexure-I, IEGC 2010 — Notification
- Dated 14 Jan 2011Extension of date of operation of Clauses 5 and 7 of Annexure-I, IEGC 2010
- Dated 18 Feb 2011Approval of Detailed Procedure for Implementation of Renewable Regulatory Fund Mechanism under IEGC Regulations, 2010
- Dated 5 May 2017Reserve Shut Down and Compensation Mechanism Order, 2017
- Dated 9 Oct 2019Methodology of Settlement of Accounts for Bilateral Short Term and Collective Transactions during Grid Disturbance — Order
Other copies of these documents (9)
- Dated 28 Apr 2010Indian Electricity Grid Code Regulations, 2010
- Dated 5 Mar 2012Indian Electricity Grid Code, 2010 — First Amendment, 2012
- Dated 6 Jan 2014Indian Electricity Grid Code (Second Amendment) Regulations, 2014
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 7 Aug 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015
- Dated 6 Apr 2016Indian Electricity Grid Code (Fourth Amendment) Regulations, 2016
- Dated 12 Apr 2017Indian Electricity Grid Code (Fifth Amendment) Regulations, 2017
- Dated 5 May 2017IEGC (Fourth Amendment) Regulations, 2016 — Commencement Notification, 2017
- Dated 12 Dec 2019Indian Electricity Grid Code (Sixth Amendment) Regulations, 2019
Earlier drafts
- Dated 12 Aug 2013Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 12 Aug 2013Explanatory memorandum: IEGC (Second Amendment) Regulations, 2013 — Explanatory Memorandum
- Dated 12 Aug 2013Public notice: Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Public Notice — Draft
- Released with the notice dated 31 Mar 2015Indian Electricity Grid Code, 2010 — Third Amendment, 2015 — Draft
- Dated 2 Jul 2015Draft Indian Electricity Grid Code Regulations, 2015 — Public Notice
- Dated 2 Jul 2015Indian Electricity Grid Code, 2010 — Fourth Amendment Regulations, 2015 — Draft
- Dated 6 Aug 2019Indian Electricity Grid Code, 2010 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
- Dated 9 Dec 2016Public notice: Draft Indian Electricity Grid Code (Fifth Amendment) Regulation, 2016 — Public Notice
- Released with the notice dated 9 Dec 2016Explanatory memorandum: Explanatory Memorandum to the IEGC amendments (spinning reserves, ancillary services, un-requisitioned power)
3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.