Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code, 2010 — Order directing Gazette publication

The Indian Electricity Grid Code, 2010

OrderDated 26 Apr 2010No. L-1/18/2010-CERC dated 26th April 2010

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Indian Electricity Grid Code Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the one-page CERC order (p1) that clears the Indian Electricity Grid Code, 2010 for publication. It records that the Commission had published the draft Code for stakeholder comment by public notice dated 12.2.2010, and that the responses received, together with those made at the public hearing on 15.3.2010, were considered carefully (p1). The Commission then directs that the IEGC 2010, as set out in the notification placed below the order, be published in the Official Gazette and be applicable with effect from 3.5.2010 (p1). It states that reasons for the decisions on the responses will be indicated separately in due course (p1). The order is signed by all four members of the Coram and dated 26 April 2010 (p1). What is not in this text is the Code itself: the notification referred to as 'placed below' does not appear in the supplied pages, so the substantive grid-code provisions are not available here.

Standard name
Grid Code
Primary topics
Grid operation and grid code

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document