IEGC (Second Amendment) Regulations, 2013 — Explanatory Memorandum

Draft Central Electricity Regulatory Commission (Indian Electricity Grid Code)(Second Amendment) Regulations, 2013

Explanatory memorandum to a draftReleased with the notice dated 12 Aug 2013

Draft

The draft has since been finalised as the Indian Electricity Grid Code, 2010 — Second Amendment, 2014.

Explanatory memorandum to the Indian Electricity Grid Code (Second Amendment) Regulations, 2013 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is CERC's explanatory memorandum for the draft Indian Electricity Grid Code (Second Amendment) Regulations, 2013. It is not the amending regulation itself but a clause-by-clause rationale for changes proposed to the IEGC Regulations, 2010. Pages 1–2 set out the background: the First Amendment of 2012 was stayed for Tamil Nadu and later implemented from 17.9.2012; two July 2012 grid failures prompted an Enquiry Committee finding on over-drawals and a POSOCO/NLDC petition, which the Commission treated as a proposal for amendment by order dated 29.11.2012 (p1–2).

The central proposal is to narrow the operating frequency band to 49.95–50.05 Hz, with 0.01 Hz step sizes requiring CTU metering changes (p3). The memorandum explains that deviation settlement is to replace the UI mechanism as a last-resort imbalance settlement with volume limits, and that deviation obligations should apply irrespective of frequency (p2, p5–8).

Most of the document, pp3–16, lists proposed amendments to specific Grid Code regulations. It adds RRF-related definitions — Coordinating Agency, Pooling Station and Reference Rate — and removes frequency-contingent provisions on governor response, drawal restriction, load shedding, ISGS despatch, hydro scheduling and grid disturbance schedule revision. It also changes the wind scheduling trigger from PPA status to commissioning of pooling stations, with effect from 15.7.2013 (p15–16).

Pages 16–19 amend Annexure 1: wind and solar forecasting, coordinating agency role, pooling-station thresholds and the RRF reference rate. Appendix I on p20 gives monthly frequency profiles for the NEW and Southern Regional grids from April 2012 to January 2013.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Deviation settlement (DSM), Scheduling and despatch

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document