IEGC Regulations, 2010 — Sixth Amendment — Corrigendum

Gazette - Corrigendum to IEGC Regulations, 2010 (Sixth Amendment)

CorrigendumDated 17 May 2020Published in the Gazette 18 Aug 2020No. L-1/18/2010-CERC dated 17th May, 2020

Replaced by Indian Electricity Grid Code Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Corrects the Indian Electricity Grid Code Regulations, 2010 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page CERC corrigendum carried in the Gazette of India (pp1–2). Its single operative sentence (p2) states that in the Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Sixth Amendment) Regulations, 2019, a sentence shall be inserted after the first sentence of the amended provisions of clause (19) of Regulation 6.5 of the Principal Regulations, so that the estimated time of restoration can be revised once in a day.

The accompanying Note (p2) identifies the instrument being corrected — the Sixth Amendment Regulations, 2019 — and records that it was published on 27.12.2019 in Part III, Section 4 of Gazette of India No. 495. Page 1 carries the gazette masthead, the advertisement number and the Hindi heading (शुद्धिपत्र) with the Commission's New Delhi dateline of 17 May 2020.

No commencement, savings or transitional provision is stated, and the corrigendum does not itself name who may exercise the one-a-day revision. It adds operative text rather than merely fixing a typographical error, so it must be read together with the Sixth Amendment Regulations, 2019 and clause 6.5(19) of the Principal Regulations.

Standard name
Grid Code
Primary topics
Grid operation and grid code

Read with this

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document