Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Draft Amendments to the Tamil Nadu Electricity Supply Code, 2020

Draft amendments to the Tamil Nadu Electricity Supply Code

Draft codeDated 6 Mar 2020TNERC/SC/7 dated .03.2020

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC draft notification (No. TNERC/SC/7) dated .03.2020 that proposes an amendment to the Tamil Nadu Electricity Supply Code. It is published under section 181 read with section 50 of the Electricity Act, 2003, and specifically under section 181(3), for persons likely to be affected. Comments are invited by 06.04.2020, with objections to be sent in duplicate to the Secretary; the draft is to be taken up after 30 days from publication on the TNERC website (p1).

The operative amendment substitutes clause (3) of regulation 5(6) with three subclauses. First, shifting an existing non-agricultural service connection that involves a change in door number, sub-door number or survey field number is to be treated as a new service connection only. Second, shifting an existing agricultural service connection may be permitted within the State, with the consumer bearing the charges on Deposit Contribution Works (DCW) basis. Third, shifting is allowed after one year from the date of effecting the service connection or the previous shifting, on a fresh application with registration fee; the Commission may consider it irrespective of the consumer's reasons after satisfactory verification of ownership and co-owner consent, and a fresh agreement may be executed for the new location (p1–2).

An explanatory statement says the Supply Code does not cover shifting of agricultural service connections and that the amendment is meant to create that provision (p3). A final statement sets out the existing and proposed provisions side by side for regulation 5(6) (p4–5).

The document is a consultation draft: it does not state a commencement date or bring the substituted clause into force. It is confined to regulation 5(6)(3), and the proposed text is numbered as subclauses 3(1) to 3(3) even though the notification describes it as a substitution for clause (3).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Agricultural supply, Connection and miscellaneous charges

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document