Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Draft Consultative Paper on Non-Tariff Related Miscellaneous Charges — Supply of CMRI Data to HT Consumers

DRAFT CONSULTATIVE PAPER ON NON-TARIFF RELATED MISCELLANEOUS CHARGES (SUPPLY OF CMRI DATA TO HT CONSUMERS)

Draft codeDated 29 Mar 2011

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply (Amendment) Code, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short draft consultative paper from the Tamil Nadu Electricity Regulatory Commission proposing a narrow addition to the State's schedule of non-tariff related miscellaneous charges, so that the distribution licensee can charge HT consumers for paper copies of meter-reading (CMRI) data.

Section 1 (p1) sets out the trigger: a 2010 miscellaneous petition by M/s Ayyanar Spinning and Weaving Mills against demand notices issued by TANGEDCO's Viruthunagar and Madurai circles, in which the consumer argued that the CMRI data was erratic and that excess-demand and excess-energy charges over the quota were computed from graphical representation rather than numeric figures. Section 2 (p1–2) records the Commission's direction that the licensee be more transparent on consumer issues, TANGEDCO's position that supplying the data costs money because roughly sixty sheets must be printed per service per month, and TANGEDCO's consequent petition to fix a rate. The paper states the proposed rate as "Rs.10/- per page and totally Rs.600/- for each month data" (p2).

Sections 3–5 (p2) cite the statutory footing (Electricity Act, 2003, ss.45, 46, 47 and 50) and quote Regulation 5(11) of the Tamil Nadu Electricity Supply Code (Notification No.TNERC/SC/7/1 dated 21-07-2004) on meter-related charges. Section 6 (p3) notes that the existing miscellaneous charges Order dated 31-08-2004 in MP No.41 of 2003 is silent on charges for CMRI data. Section 7 (p3) gives notice of the intention to amend subclause V(2) of Serial No.2.0 of that Order. Section 8 (p3) invites written stakeholder views by 30-04-2011.

It is a consultation document only: nothing is fixed yet and no commencement date is stated.

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, Metering

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document