Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply (Amendment) Code, 2009

AmendmentDated 29 Dec 2009TNERC/SC/ 7-16 dated 29/12/2009

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Tamil Nadu Electricity Regulatory Commission issued this notification on 29 December 2009 to amend regulation 15(3) of the Tamil Nadu Electricity Supply Code (p1). The problem it addresses is narrow: cheques tendered by government departments and local bodies towards current consumption charges were being dishonoured, often for want of funds, and the existing rule required the licensee to watch a consumer's record for three consecutive billing periods before restoring the cheque facility — a condition those bodies said their own internal procedures made impossible to meet (p1).

Clause 1 gives the short title and provides that the amendment comes into force on the date of publication in the Tamil Nadu Government Gazette; the Gazette date is not printed in the text (p1).

Clause 2 substitutes a wholly new sub-regulation (3) for regulation 15 (p1–2). The replacement restates the accepted modes of payment for low-tension consumers — cash, money order, demand draft, cheque drawn on a bank where the distribution section office is located, or electronic payment as the distribution licensee stipulates — and preserves the existing concession letting local bodies and Railways issue cheques on banks at their own office locations, with collection charges recoverable (p2).

The operative change is in restoration of the cheque facility: the licensee must normally watch three consecutive billing periods for LT consumers and three months for HT consumers, but may restore the facility for services in the name of local bodies and government departments (Central and State) without that performance watch (p2). For all other consumers the restoration option is capped at a stated number of occasions, and additional service charges for cheque dishonour are payable on top of the service charges the Commission stipulates — set as a percentage of the dishonoured cheque amount, with different floors for LT and HT consumers (p2).

Standard name
Electricity Supply Code
Primary topics
Billing and payment, Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document