TNERC · Tamil Nadu Electricity Regulatory Commission
Tamil Nadu Electricity Supply Code, 2004 — Power Factor and Minimum Charges Amendment, 2020 — Draft
Draft of amendment to the Tamil Nadu Electricity Supply Code, 2004
Draft amendmentDated 9 Oct 2020TNERC/SC/7–…… dated …..-08-2020
Draft
A proposal that has since been finalised as the Tamil Nadu Electricity Supply Code and Distribution Code Amendments, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a TNERC draft notification placing on the record a proposed two-clause amendment to the Tamil Nadu Electricity Supply Code, 2004, and inviting objections or suggestions from anyone likely to be affected. It is issued under section 181 read with section 50 of the Electricity Act, 2003, and is published on the Commission's website as required by section 181(3) (p1). Comments are to be sent in duplicate with a soft copy to the Secretary by the stated deadline, and the draft is to be taken up for consideration only after thirty days from publication (p1). The notification number and date line are incomplete, and no Gazette publication date appears.
Clause 1 substitutes regulation 4(1)(iii) of the Supply Code with a fresh "Disincentive for power factor" provision. It obliges every consumer to maintain a minimum power factor that differs by supply category — LT, 11 kV and 22 kV HT, and 33 kV and above HT — and makes a consumer who falls short liable to pay compensation by way of disincentive at rates the Commission may declare from time to time (p2). The highest of these floors, 0.95 for 33 kV and above, is the one the explanatory statement ties to CEA's connectivity standards (p2, p4).
Clause 2 substitutes regulation 6 on minimum charges. It restates that consumers pay minimum/fixed charges for every connection, that these remain payable even where no electricity is consumed or where supply is disconnected for any reason including a court order, and where the price of electricity supplied falls below the minimum charges. An explanation equates "monthly minimum charges / minimum charges" wherever used in the Supply Code or Distribution Code with the minimum/fixed charges prescribed in the Commission's tariff orders, and provides that services with sanctioned demand above 112KW are charged on HT terms for the full sanctioned load (p2-3).
The explanatory statement justifies both changes: alignment with the CEA Technical Standards for Connectivity to the Grid (Amendment) Regulations, 2019 for voltage regulation and grid stability, and clarity on how minimum charges relate to tariff-order fixed charges (p4). A closing statement sets out existing provisions beside the proposed text (p5-6).
Read with this
The regulation
- Dated 21 Jul 2004Tamil Nadu Electricity Supply Code (TNESC)
Amendments and corrections
- Dated 22 Nov 2005Tamil Nadu Electricity Supply (Amendment) Code 2005 — load addition/reduction, surcharge and BPSC
- Dated 19 May 2006Tamil Nadu Electricity Supply (Amendment) Code 2006
- Dated 20 Sep 2006Tamil Nadu Electricity Supply Code — Explanation on Refund of Tariff Minimum, 2006
- Dated 10 Apr 2007Tamil Nadu Electricity Supply (Amendment) Code, 2007
- Dated 25 May 2007Tamil Nadu Electricity Supply Code, 2004 — Amendment Code 2007
- Dated 23 Aug 2007Tamil Nadu Electricity Supply Code, 2004 — Second Amendment Code, 2007
- Dated 3 Dec 2007Tamil Nadu Electricity Supply Code, Distribution Code and Standard of Performance (Amendment) Regulations 2007
- Dated 14 Dec 2007Tamil Nadu Electricity Supply Code — Second Amendment, 2007
- Dated 6 Jun 2008Tamil Nadu Electricity Supply (Amendment) Code 2008
- Dated 31 Jul 2008Tamil Nadu Electricity Supply (Amendment) Code 2008 — disconnection for arrears
- Dated 15 Dec 2008Tamil Nadu Electricity Supply (Amendment) Code, 2008
- Dated 27 Feb 2009Tamil Nadu Electricity Supply Code, 2004 — Amendment Code, 2009
- Dated 15 Jun 2009Tamil Nadu Electricity Supply Code, 2004 — Amendment Code, 2009
- Dated 29 Jun 2009Tamil Nadu Electricity Supply (Amendment) Code 2009
- Dated 9 Oct 2009Amendment to Regulation 19, 20 & 23 of Supply Code
- Dated 29 Dec 2009Tamil Nadu Electricity Supply (Amendment) Code, 2009
- Dated 6 May 2010Tamil Nadu Electricity Supply (Amendment) Code 2010
- Dated 25 Oct 2010Tamil Nadu Electricity Supply Code, 2005 — Amendment Code 2010
- Dated 27 May 2011Tamil Nadu Electricity Supply (Amendment) Code, 2011
- Dated 29 Nov 2012Tamil Nadu Electricity Supply Code Amendment, 2012
- Dated 12 Sep 2013Tamil Nadu Electricity Supply Code — Minimum Charges Amendment, 2013
- Dated 23 Sep 2013Tamil Nadu Electricity Supply Code and State Advisory Committee Regulations — Amendments, 2013
- Dated 26 Nov 2013Tariff Regulations, Distribution Code and Supply Code — Amendments, 2013
- Dated 3 Jun 2014Tamil Nadu Electricity Supply Code, 2004 — Regulation 22 Amendment, 2014
- Dated 1 Jul 2014Tamil Nadu Electricity Supply Code — Amendment to Regulations 4, 5, 7, 15 and 27, 2014
- Dated 5 Nov 2014Tamil Nadu Electricity Supply Code — Errata to Notification, 2014
- Dated 22 Apr 2015Tamil Nadu Electricity Supply Code, 2004 — Mode of Payment Amendment, 2015
- Dated 2 Mar 2018Tamil Nadu Electricity Distribution Code Amendments, 2018
- Dated 2 Mar 2018Tamil Nadu Electricity Supply Code — Amendments, 2018
- Dated 18 Dec 2019Tamil Nadu Electricity Supply Code — Amendments, 2019
- Dated 9 Jun 2020Tamil Nadu Electricity Supply Code and Distribution Code — LT/HT 150 kW Amendment, 2020
- Dated 27 Jun 2020Tamil Nadu Electricity Supply Code, 2004 — Amendment (Regulation 14A, AMR/AMI billing notice)
- Dated 16 Jul 2020Tamil Nadu Electricity Supply Code and Distribution Code — Amendments, 2020
- Dated 16 Jul 2020Tamil Nadu Electricity Distribution Code — Agricultural Service Connection Amendments, 2020
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendments, 2021
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendment, 2021
- Dated 26 May 2021Tamil Nadu Electricity Supply Code, 2004 — Wheeling and Network Charges Amendment, 2021
- Dated 29 Mar 2022Tamil Nadu Electricity Supply Code, 2004 — Harmonic Control Amendment, 2022
- Dated 26 Jul 2022Tamil Nadu Electricity Supply Code, 2004 — Amendment, 2022
- Dated 2 Sep 2023Tamil Nadu Electricity Supply Code, 2004 — Amendments, 2023
Consolidated copies, for reference (4)
- Dated 31 Jul 2008Tamil Nadu Electricity Supply Code — Consolidated, as amended up to 31.7.2008
- Dated 31 Dec 2009Tamil Nadu Electricity Supply Code (TNESC) — Consolidated, as amended upto 31-12-2009
- Dated 31 Dec 2010Tamil Nadu Electricity Supply Code — Consolidated as amended upto 31-12-2010
- Dated 31 Mar 2024Tamil Nadu Electricity Supply Code — Consolidated as amended up to 31-03-2024
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 11 Apr 2006Tamil Nadu Electricity Supply Code — 2006 Amendment
- Dated 4 Dec 2009Tamil Nadu Electricity Supply (Amendment) Code, 2009
- Dated 21 Jun 2010Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2010 — Draft
- Dated 13 Jul 2010Tamil Nadu Electricity Supply (Amendment) Code, 2010 — Draft
- Dated 14 Jan 2011Tamil Nadu Electricity Supply (Amendment) Code, 2011 — Draft
- Dated 29 Mar 2011Draft Consultative Paper on Non-Tariff Related Miscellaneous Charges — Supply of CMRI Data to HT Consumers
- Dated 5 Apr 2011Tamil Nadu Electricity Supply Code, 2004 — 2011 Amendment — Draft
- Dated 30 Sep 2011Tamil Nadu Electricity Supply (Amendment) Code, 2011 — Security Deposit for Non-Owner Consumers
- Dated 24 Aug 2012Tamil Nadu Electricity Supply (Amendment) Code, 2012 — Draft
- Dated 28 Jun 2013Tamil Nadu Electricity Supply Code, 2005 — Draft Amendment — Minimum Charges for Disconnected HT Services
- Dated 12 Sep 2013Draft Amendment to Regulation 3 of the Tamil Nadu Electricity Supply Code, 2013
- Dated 27 May 2014Tamil Nadu Electricity Supply Code, 2004 — Additional Security Deposit (Partial Open Access) Amendment, 2014 — Draft
- Dated 7 Jan 2015Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment
- Dated 24 May 2017Tamil Nadu Electricity Supply Code — Power Factor Disincentive Amendment, 2017 — Draft
- Dated 6 Jul 2017Tamil Nadu Electricity Supply Code — Draft Amendment, 2017
- Dated 9 Jul 2019Draft Amendment to the Tamil Nadu Electricity Supply Code, 2019
- Dated 7 Nov 2019Tamil Nadu Electricity Supply Code — Draft Amendment, 2019
- Dated 6 Mar 2020Draft Amendments to the Tamil Nadu Electricity Supply Code, 2020
- Dated 23 Dec 2020Procedure of Assessment where Bi-directional Meter is Defective or Absent — Draft Amendment to the Tamil Nadu Electricity Supply Code, 2004
- Dated 19 Mar 2021Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment (Wheeling Charges)
- Dated 29 Jun 2021Tamil Nadu Electricity Supply Code — Harmonic Limits Amendment, 2021 — Draft
- Dated 9 Jun 2022Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment, 2022
- Dated 28 Jun 2022Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment
- Dated 27 Apr 2023Tamil Nadu Electricity Supply Code, 2004 — Draft Amendments, 2023
32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.