Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code — Minimum Charges Amendment, 2013

Amendment to TNERC Supply Code

AmendmentDated 12 Sep 2013Published in the Gazette 23 Oct 2013TNERC/SC/7-32 dated 12-9-2013

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Government Gazette notification (Part VI—Section 2, No. 41, dated 23 October 2013) carrying the Tamil Nadu Electricity Regulatory Commission's amendment to the Tamil Nadu Electricity Supply Code, issued as Notification No. TNERC/SC/7-32 dated 12-9-2013. The operative amendment (p2) is made under s.181(2)(x) of the Electricity Act 2003 after prior publication of the draft under s.181(3), and substitutes the first proviso to regulation 6(b) — the minimum-charges regulation. The substituted proviso lets the licensee recover a minimum charge computed on a percentage of contracted demand or recorded demand, whichever is higher, plus charges for actual consumption, where it is prevented from supplying, or the consumer is prevented from consuming, electricity because of cyclone, floods, storms, fire, strike or lockout, or other occurrences beyond the licensee's control. An explanatory statement (p2) gives the rationale. A two-column statement (p3) sets the existing provision against the amended one; it also shows wording changes inside regulation 6(b) itself — "sanctioned demand" and "billable demand" becoming "contracted demand" — which the operative clause does not expressly substitute. The gazette contents page (p1) shows the same issue also carries amendments to the Distribution Standards of Performance Regulations, a second Supply Code amendment, and Regulation 12 of the State Advisory Committee Regulations 2004.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document