TNERC · Tamil Nadu Electricity Regulatory Commission
Tamil Nadu Electricity Supply Code, 2004 — Amendment Code 2007
Tamil Nadu Electricity Supply (Amendment) Code 2007
AmendmentDated 25 May 2007Published in the Gazette 13 Jun 2007TNERC / SC / 7- 4 dated 25.05.2007
Amends the Tamil Nadu Electricity Supply Code (TNESC).
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a TNERC amending regulation of 2007 that rewrites the enforcement half of the Tamil Nadu Electricity Supply Code 2004. The recitals (pp1–3) explain why: the Board said the Code lacked procedures for assessing theft and unauthorised use, for disconnecting supply and removing equipment, and for saying who may conduct a disputed meter's special test. The amendment is made under s.181 read with s.50 of the Electricity Act 2003, after previous publication (p3).
Regulations 1–13 (pp3–9) are a mix of drafting fixes and substantive changes to the principal code: new definitions of 'Board', 'distribution licensee', 'Engineer' and 'Person' (reg.2); service connection charges, capacitor ratings for motors and welding transformers, and agricultural motor-capacity assessment and appeal mechanics (regs 3–5); meter special tests to be done at an NABL-accredited third-party laboratory, with the Chief Electrical Inspector as the interim tester (reg.6, p8); notice for disconnection extended from 24 to 48 hours (reg.9); substitution of the 'Engineer' by a 'designated authority of the distribution licensee' throughout regs 15 and 17; and an Explanation treating EHT consumers as HT consumers (p6).
The core of the document is regulations 14 and 16. Regulation 14 (pp9–11) inserts a new regulation 19-A — procedure for disconnection and removal of unauthorised use of electricity under s.126, including inspection, reporting, provisional and final assessment orders, instalment relief, and a fifteen-day notice before disconnection. Regulation 16 (pp12–24) inserts two new sub-regulations into reg.23: (AA) a step-by-step procedure for assessment of charges, disconnection and removal of plant in theft cases under s.135 — inspection, sealed meter testing with notice to the accused, provisional and final assessment orders in Forms 9 and 10, hearing, payment and compounding; and (BB) fourteen licensee duties to prevent theft, diversion and tampering, including pilfer-proof metering, inspections, consumption monitoring, feeder-loss display and meter-reader rotation. Regulation 19 adds Forms 8–11 to the Code's Appendix, including the Form 8 assessment formula and its load-factor and usage-hour tables (pp25–26).
Regulations 14 and 16 are retrospectively deemed in force from 1 September 2004, the date the principal code was notified (p3). The remaining amendments take effect on gazette publication.
Read with this
The regulation
- Dated 21 Jul 2004Tamil Nadu Electricity Supply Code (TNESC)
Amendments and corrections
- Dated 22 Nov 2005Tamil Nadu Electricity Supply (Amendment) Code 2005 — load addition/reduction, surcharge and BPSC
- Dated 19 May 2006Tamil Nadu Electricity Supply (Amendment) Code 2006
- Dated 20 Sep 2006Tamil Nadu Electricity Supply Code — Explanation on Refund of Tariff Minimum, 2006
- Dated 10 Apr 2007Tamil Nadu Electricity Supply (Amendment) Code, 2007
- Dated 23 Aug 2007Tamil Nadu Electricity Supply Code, 2004 — Second Amendment Code, 2007
- Dated 3 Dec 2007Tamil Nadu Electricity Supply Code, Distribution Code and Standard of Performance (Amendment) Regulations 2007
- Dated 14 Dec 2007Tamil Nadu Electricity Supply Code — Second Amendment, 2007
- Dated 6 Jun 2008Tamil Nadu Electricity Supply (Amendment) Code 2008
- Dated 31 Jul 2008Tamil Nadu Electricity Supply (Amendment) Code 2008 — disconnection for arrears
- Dated 15 Dec 2008Tamil Nadu Electricity Supply (Amendment) Code, 2008
- Dated 27 Feb 2009Tamil Nadu Electricity Supply Code, 2004 — Amendment Code, 2009
- Dated 15 Jun 2009Tamil Nadu Electricity Supply Code, 2004 — Amendment Code, 2009
- Dated 29 Jun 2009Tamil Nadu Electricity Supply (Amendment) Code 2009
- Dated 9 Oct 2009Amendment to Regulation 19, 20 & 23 of Supply Code
- Dated 29 Dec 2009Tamil Nadu Electricity Supply (Amendment) Code, 2009
- Dated 6 May 2010Tamil Nadu Electricity Supply (Amendment) Code 2010
- Dated 25 Oct 2010Tamil Nadu Electricity Supply Code, 2005 — Amendment Code 2010
- Dated 27 May 2011Tamil Nadu Electricity Supply (Amendment) Code, 2011
- Dated 29 Nov 2012Tamil Nadu Electricity Supply Code Amendment, 2012
- Dated 12 Sep 2013Tamil Nadu Electricity Supply Code — Minimum Charges Amendment, 2013
- Dated 23 Sep 2013Tamil Nadu Electricity Supply Code and State Advisory Committee Regulations — Amendments, 2013
- Dated 26 Nov 2013Tariff Regulations, Distribution Code and Supply Code — Amendments, 2013
- Dated 3 Jun 2014Tamil Nadu Electricity Supply Code, 2004 — Regulation 22 Amendment, 2014
- Dated 1 Jul 2014Tamil Nadu Electricity Supply Code — Amendment to Regulations 4, 5, 7, 15 and 27, 2014
- Dated 5 Nov 2014Tamil Nadu Electricity Supply Code — Errata to Notification, 2014
- Dated 22 Apr 2015Tamil Nadu Electricity Supply Code, 2004 — Mode of Payment Amendment, 2015
- Dated 2 Mar 2018Tamil Nadu Electricity Distribution Code Amendments, 2018
- Dated 2 Mar 2018Tamil Nadu Electricity Supply Code — Amendments, 2018
- Dated 18 Dec 2019Tamil Nadu Electricity Supply Code — Amendments, 2019
- Dated 9 Jun 2020Tamil Nadu Electricity Supply Code and Distribution Code — LT/HT 150 kW Amendment, 2020
- Dated 27 Jun 2020Tamil Nadu Electricity Supply Code, 2004 — Amendment (Regulation 14A, AMR/AMI billing notice)
- Dated 16 Jul 2020Tamil Nadu Electricity Supply Code and Distribution Code — Amendments, 2020
- Dated 16 Jul 2020Tamil Nadu Electricity Distribution Code — Agricultural Service Connection Amendments, 2020
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendments, 2021
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendment, 2021
- Dated 26 May 2021Tamil Nadu Electricity Supply Code, 2004 — Wheeling and Network Charges Amendment, 2021
- Dated 29 Mar 2022Tamil Nadu Electricity Supply Code, 2004 — Harmonic Control Amendment, 2022
- Dated 26 Jul 2022Tamil Nadu Electricity Supply Code, 2004 — Amendment, 2022
- Dated 2 Sep 2023Tamil Nadu Electricity Supply Code, 2004 — Amendments, 2023
Consolidated copies, for reference (4)
- Dated 31 Jul 2008Tamil Nadu Electricity Supply Code — Consolidated, as amended up to 31.7.2008
- Dated 31 Dec 2009Tamil Nadu Electricity Supply Code (TNESC) — Consolidated, as amended upto 31-12-2009
- Dated 31 Dec 2010Tamil Nadu Electricity Supply Code — Consolidated as amended upto 31-12-2010
- Dated 31 Mar 2024Tamil Nadu Electricity Supply Code — Consolidated as amended up to 31-03-2024
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 11 Apr 2006Tamil Nadu Electricity Supply Code — 2006 Amendment
- Dated 4 Dec 2009Tamil Nadu Electricity Supply (Amendment) Code, 2009
- Dated 21 Jun 2010Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2010 — Draft
- Dated 13 Jul 2010Tamil Nadu Electricity Supply (Amendment) Code, 2010 — Draft
- Dated 14 Jan 2011Tamil Nadu Electricity Supply (Amendment) Code, 2011 — Draft
- Dated 29 Mar 2011Draft Consultative Paper on Non-Tariff Related Miscellaneous Charges — Supply of CMRI Data to HT Consumers
- Dated 5 Apr 2011Tamil Nadu Electricity Supply Code, 2004 — 2011 Amendment — Draft
- Dated 30 Sep 2011Tamil Nadu Electricity Supply (Amendment) Code, 2011 — Security Deposit for Non-Owner Consumers
- Dated 24 Aug 2012Tamil Nadu Electricity Supply (Amendment) Code, 2012 — Draft
- Dated 28 Jun 2013Tamil Nadu Electricity Supply Code, 2005 — Draft Amendment — Minimum Charges for Disconnected HT Services
- Dated 12 Sep 2013Draft Amendment to Regulation 3 of the Tamil Nadu Electricity Supply Code, 2013
- Dated 27 May 2014Tamil Nadu Electricity Supply Code, 2004 — Additional Security Deposit (Partial Open Access) Amendment, 2014 — Draft
- Dated 7 Jan 2015Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment
- Dated 24 May 2017Tamil Nadu Electricity Supply Code — Power Factor Disincentive Amendment, 2017 — Draft
- Dated 6 Jul 2017Tamil Nadu Electricity Supply Code — Draft Amendment, 2017
- Dated 9 Jul 2019Draft Amendment to the Tamil Nadu Electricity Supply Code, 2019
- Dated 7 Nov 2019Tamil Nadu Electricity Supply Code — Draft Amendment, 2019
- Dated 6 Mar 2020Draft Amendments to the Tamil Nadu Electricity Supply Code, 2020
- Dated 9 Oct 2020Tamil Nadu Electricity Supply Code, 2004 — Power Factor and Minimum Charges Amendment, 2020 — Draft
- Dated 23 Dec 2020Procedure of Assessment where Bi-directional Meter is Defective or Absent — Draft Amendment to the Tamil Nadu Electricity Supply Code, 2004
- Dated 19 Mar 2021Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment (Wheeling Charges)
- Dated 29 Jun 2021Tamil Nadu Electricity Supply Code — Harmonic Limits Amendment, 2021 — Draft
- Dated 9 Jun 2022Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment, 2022
- Dated 28 Jun 2022Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment
- Dated 27 Apr 2023Tamil Nadu Electricity Supply Code, 2004 — Draft Amendments, 2023
32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.