Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code (TNESC) — Consolidated, as amended upto 31-12-2009

Tamil Nadu Electricity Supply Code (TNESC)

Consolidated copyDated 31 Dec 2009TNERC/SC/7-17dated dated 20/01/2010

A consolidated copy of the Tamil Nadu Electricity Supply Code (TNESC), published by TNERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 31 of 90. Check the regulator's original before you rely on it.

Pages 1–2 are a TNERC notification (No. TNERC/SC/7-17 dated 20/01/2010) re-publishing the Tamil Nadu Electricity Supply Code in the Gazette as amended up to 31-12-2009. It lists the 17 earlier Code notifications and amendment codes incorporated and says the object is to give the public an up-to-date consolidated text. The actual Code begins at p3, with its original 2004 notification and the statement that it is made under s.50 read with s.181 of the Electricity Act, 2003.

Chapter 1 (pp3–5) contains the short title and commencement clause and definitions used across the Code: consumer, connected/contracted load and demand, LT/HT/EHT consumer, distribution licensee, Engineer, consumer meter card, power factor, etc. Chapter 2 is titled Electricity Charges—Billing and Recovery. Its early regulations (pp5–6) classify supply categories by phase, voltage and connected load/demand thresholds, and reg.4 (pp6–7) lists the charges a licensee may recover—tariff-related charges, miscellaneous charges and minimum charges. Reg.5 (pp7–20) is the long miscellaneous-charges block: capacitor compensation, excess demand and excess contracted load (especially agricultural services), belated payment surcharge, additional security deposit, shifting, name transfer, reconnection, meter-related and application registration charges, and restriction-and-control excess charges. Reg.6 (pp20–21) sets minimum-charge principles for disconnected HT/LT services.

Reg.7 (pp22–24) governs installation of meters: metering obligation, sealing, consumer-purchased meters, testing and replacement responsibilities, LT-side metering of HT services, and special tests through NABL/Chief Electrical Inspector. Regs.8–10 (pp24–27) specify meter reading, billing intervals, consumer meter card entries, rounding, changes in sanctioned demand, and procedure when meters are inaccessible. Reg.11 (pp27–28) gives assessment methods where there is no meter or the meter is defective; regs.12–13 (pp28–29) deal with billing errors and servicing of bills. Regs.14–15 (pp29–31) set due dates, notice periods, disconnection/reconnection principles and modes of payment, with reg.15 cut off mid-text at p31. The pages are only 1–31 of 90.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Billing and payment, Metering

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (3)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document