Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code — Amendments, 2018

Amendments to the Tamil Nadu Electricity Supply code

AmendmentDated 2 Mar 2018Published in the Gazette 4 Apr 2018TNERC/SC/7 -39 dated 02.03.2018

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Tamil Nadu Electricity Regulatory Commission amends three provisions of the Tamil Nadu Electricity Supply Code. It is carried in the Tamil Nadu Government Gazette of 4 April 2018 (Part VI—Section 2) as Notification No. TNERC/SC/7-39 dated 02.03.2018, signed by the Commission's Secretary at Chennai on 20 March 2018 (p1–2). The Commission states it acts under s.181 read with s.50 of the Electricity Act 2003, after the draft was previously published as required by s.181(3) (p2).

Three changes are made (p2–3). First, regulation 4(1)(vi) — the requirement to keep advance current consumption charges adequate and to adjust them at extension of temporary supply — is omitted. Second, regulation 5(2)(iii) is substituted with a new basis for excess demand charges on temporary supply, split between HT and LT supply, with the LT branch turning on whether recorded demand exceeds a stated kW threshold. Third, regulation 22(3) is replaced so that approval of the competent authority on safety and security is needed to restore a High Tension connection disconnected for six months or more, rather than one year.

An Explanatory Statement (p3) gives the reason for each change: the advance CC charge conflicted with the security-deposit provision in regulation 39(2)(ii) of the Tamil Nadu Electricity Distribution Code; excess demand charges should apply to all categories on par with regular supply; and the restoration rule follows the CEA (Measures relating to safety and electric supply) Regulations, 2010. A side-by-side table of existing and amended text follows (p3–4).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document