Tamil Nadu Electricity Supply Code — Consolidated as amended upto 31-12-2010

Tamil Nadu Electricity Supply Code (TNESC)

Consolidated copyDated 31 Dec 2010Published in the Gazette 13 Apr 2011Notification No. TNERC/SC/7-24 dated 18/03/2011

A consolidated copy of the Tamil Nadu Electricity Supply Code (TNESC), published by TNERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 17 of 50. Check the regulator's original before you rely on it.

This is Tamil Nadu's consolidated electricity supply code — the state rulebook for how electricity is charged, billed, metered and cut off. TNERC's re-publication notice (No. TNERC/SC/7-24, dated 18/03/2011) records that the Code was first notified in 2004 and then amended by twenty-two further notifications, and that the Commission is re-publishing the whole text as amended up to 31-12-2010 so the public has one up-to-date version (pp2–3). The notice appears in the Tamil Nadu Government Gazette of 13 April 2011 (p1).

The reprint opens with the original 2004 notification (No. TNERC/SC/7/1, dated 21-07-2004), made under section 50 read with section 181 of the Electricity Act 2003, and states the matters the Code must cover — recovery of charges, billing intervals, disconnection and restoration, tampering, and licensee entry for meters and lines (p3). Chapter 1 (pp4–5) gives the short title, commencement on Gazette publication, and definitions — connected and contracted load, consumer, consumer meter card, engineer, EHT/HT/LT consumer, load factor, occupier, person, power factor and State Transmission Utility.

Chapter 2 is the operative core. Regulation 3 sets out categories of supply by phase, voltage and load/demand thresholds (p5). Regulation 4 lists what a licensee may recover — tariff-related charges, miscellaneous charges and minimum charges — and regulations 5 and 6 specify each head: capacitor compensation for motor and welding loads, excess demand charge (with separate treatment for small LT services), excess contracted load charge for agricultural connections, belated payment surcharge, additional security deposit, service/line shifting, name transfer, reconnection, meter-card replacement, dishonoured cheques, meter charges, application registration, restriction-and-control charges, and minimum charges for disconnected HT and LT services (pp5–13).

Regulations 7 to 15 cover metering and payment: installation, sealing, recalibration and testing of meters (including third-party NABL testing), replacement liability for defective, damaged or burnt meters (pp13–14); meter reading, billing intervals and rounding (pp14–15); billing where the meter is inaccessible, absent or defective, and correction of billing errors (pp15–16); servicing of bills, minimum due dates and notice periods, disconnection consequences, and accepted modes of payment (pp16–17).

Every page carries footnotes naming the amending notification and its effective date, and often reproducing the earlier wording.

Standard name
Electricity Supply Code
Primary topics
Billing and payment, Metering, Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (3)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document