Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code — 2006 Amendment

Tamil Nadu Electricity Supply (Amendment) Code 2006

Draft amendmentDated 11 Apr 2006TNERC / SC / 7-3 dated 04.2006

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Tamil Nadu Electricity Regulatory Commission amends the Tamil Nadu Electricity Supply Code, 2004 by inserting three new regulations — 26A, 26B and 26C — into its Chapter 4, together with an assessment Annexure. The preamble sets out the trigger: the distribution licensee (Tamil Nadu Electricity Board) could not act against theft of electricity because the Supply Code carried no provision for assessment or disconnection, and the Centre's Electricity (Removal of Difficulties) Order 2005 required supply codes to include such provisions (p1). The amendment is made under s.181 read with s.50 of the Electricity Act 2003, has gone through previous publication, and takes effect on publication in the Tamil Nadu Gazette (p1–2).

Regulation 26A is the core and the longest part (p2–9). It lays out an end-to-end procedure for theft cases: inspection by an authorised officer on his own motion or on information, an inspection report recording connected load, seal condition, meter working and the modus operandi, sealing and laboratory testing of a suspect meter, a show-cause notice accompanied by a provisional assessment, a personal hearing, and a reasoned final assessment order — each step with its own day-count, plus rules for service where the accused evades receipt. It also specifies when supply is cut on the spot, the conditions for restoration, instalment payment on written request, surcharge, and disconnection on default after notice. An Explanation following it defines 'accused person', 'authorised officer' and 'concerned licensee' (p9–10).

Regulation 26B (p10–11) deals with unauthorised use of electricity under s.126: inspection and reporting by an assessing officer, recovery of the assessed amount if not deposited, disconnection after fifteen days' notice, crediting of amounts already paid and removal of the cause of unauthorised use.

Regulation 26C (p12–14) shifts to prevention, imposing duties on the licensee: routine meter testing, pilfer-proof boxes and anti-tampering meters in industrial connections and larger loads, electromagnetic immunity for HT/EHT metering, annual inspection quotas including a share of total connections, monthly consumption monitoring for high-value consumers, remote metering, publicity, website disclosure of feeder losses, security staff for inspecting officers charged to the ARR, distribution-transformer metering, HV distribution systems, meter relocation and rotation of meter readers.

The Annexure (p15–16) supplies the assessment formula — energy as the product of load, load factor, hours of use and days — with tables fixing load factors and daily usage hours by usage category and by shift pattern, plus a rule for assessing HT maximum demand.

Standard name
Electricity Supply Code
Primary topics
Theft and unauthorised use, Metering

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document