Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code, 2004 — Additional Security Deposit (Partial Open Access) Amendment, 2014 — Draft

Draft of amendments to the Tamil Nadu Electricity Supply Code

Draft amendmentDated 27 May 2014No.TNERC/SC/7- dated 27-05-2014

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply Code, 2004 — Regulation 22 Amendment, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Electricity Regulatory Commission draft notification dated 27 May 2014 proposing a one-clause amendment to the Tamil Nadu Electricity Supply Code, 2004 (p1). It publishes the draft for objections under section 181(3) of the Electricity Act, 2003 and invites comments by 13 June 2014; the draft is to be taken up after fifteen days from publication of the notice on the TNERC website, with objections or suggestions sent in duplicate to the Secretary (p1).

The operative draft inserts an Explanation after item (d) in regulation 5(5)(ii). For consumers who meet part of their consumption through open access, it requires electricity charges for the billing period to be calculated on net energy — total consumption less the open-access energy — and the security deposit for the period to be twice the maximum of such electricity charges (p1). The amendment is therefore about the additional security deposit and the billing base for partial open-access consumers, not about the substantive conditions of open access.

The explanatory statement says the change is intended to determine additional security deposit for such consumers, make the Supply Code comprehensive on additional security deposit, and retain billing periodicity as the basis for determining it in all cases (p3). A statement showing the existing provision and the provision after amendment follows (pp3–4), and the notification closes with the Secretary's order/signature (pp2, 4). No commencement date or final amendment is stated; the document remains a draft for consultation.

Standard name
Electricity Supply Code
Primary topics
Security deposit, Billing and payment

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document