Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply (Amendment) Code, 2011 — Draft

Tamil Nadu Electricity Supply (Amendment) Code, 2011

Draft amendmentDated 14 Jan 2011TNERC/SC/ 7- dated -01-2011

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply (Amendment) Code, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Electricity Regulatory Commission draft notification proposing amendments to the Tamil Nadu Electricity Supply Code, 2004 (called "the Principal Code"), issued subject to the condition of previous publication so that the changes take effect only on publication in the Tamil Nadu Government Gazette (p1–2). The preamble recalls that the Principal Code was notified under section 50 of the Electricity Act 2003 and gazetted on 1 September 2004, and that changes concerning the periodicity of meter reading and the modes of collecting Current Consumption Charges made the amendments necessary (p1).

Clause 1 supplies the short title and makes commencement conditional on Gazette publication (p2). Clause 2 substitutes Regulation 8(1): for low-tension connections the licensee, with Commission approval, decides the periodicity of meter readings, collection dates and modes; temporary supplies are read at the end of a short sanction or monthly; the licensee's right of access to premises is tied to section 163 of the Act; and the meter-card format needs Commission approval with entries made in full. Sub-regulation (3) of Regulation 8 is omitted (p2).

Clause 3 rewrites Regulation 10 on inaccessibility of meters — the escalating sequence of provisional charging, a notice to open the premises at a fixed time, advance warning of disconnection under section 163(3) and reconnection charges after disconnection (p2–4).

Clause 4 rewrites Regulation 15 on payment of bills. For high-tension consumers it fixes due dates set by the licensee, lists permitted payment instruments, states what is preferred for larger amounts, allows cash at the designated authority's discretion, states the consequence of cheque dishonour, provides for disconnection where payment is not received within the notice period, and allows extension on application subject to belated payment surcharge. For low-tension consumers it covers payment channels, cheques from local bodies and Railways with collection charges, restoration of the cheque facility after demonstrated payment performance, limits on how often that concession can be given, and service charges for dishonoured cheques differentiated between LT and HT consumers (p4–6).

Standard name
Electricity Supply Code
Primary topics
Metering, Billing and payment, New connections and load changes

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document