Procedure of Assessment where Bi-directional Meter is Defective or Absent — Draft Amendment to the Tamil Nadu Electricity Supply Code, 2004

Procedure of assessment in the case of when the Bi-directional meter becomes defective and no meter is there in that Service connection

Draft amendmentDated 23 Dec 2020TNERC/SC/7 dated …..-01-2021

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply Code and Distribution Code Amendments, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC draft notification that proposes to add a new Regulation 11A to the Tamil Nadu Electricity Supply Code, 2004, and it is published for public comment rather than as a made instrument (p1). The notice puts the comment deadline at 08-01-2021, says the draft will be taken up on or after fifteen days from its publication on the TNERC website, and describes the proposal as made under section 181 read with section 50 of the Electricity Act, 2003 (p1).

The operative text (pp2-5) fills a gap the Commission identifies in its Explanatory Statement: Regulation 11 of Chapter 2 already deals with missing or defective meters on ordinary LT services that record import only, but nothing covers bi-directional meters that record both import and export (p6). The proposed regulation is confined to LT Solar Rooftop services and is split into an import stream (A) and an export stream (B).

For import (pp2-3) it sets a hierarchy of assessment methods: average of the preceding four months where conditions were comparable; where the meter fails immediately after installation, average of the succeeding four months once a healthy meter is in place, with monthly minimum charges collected provisionally and trued up after assessment; a comparable consecutive four-month block within the preceding twelve months where conditions differed; and, failing all of these, assessment by the Engineer in charge of the distribution. Disputes go up one level within the licensee and then to the Consumer Grievance Redressal Forum (p3).

For export (pp3-5) it applies the same preceding/succeeding four-month averaging, but where the meter fails at once and no history exists it prescribes a provisional estimate built on a fixed capacity utilisation factor plus assumptions about daily generation per kW and prosumer self-consumption, with a formula for the units exported and reworking once four months of healthy-meter data exist. The same two-step grievance route applies (pp3-5).

The Explanatory Statement (p6) records that the amendment follows a TNERC order in M.P. No. 13 of 2020 filed by TANGEDCO (CE/Commercial). Pages 7-10 are a comparative statement of existing and proposed text, and p11 carries the Secretary's signature.

Standard name
Electricity Supply Code
Primary topics
Billing and payment, Metering, Net metering

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document