TNERC · Tamil Nadu Electricity Regulatory Commission
Tamil Nadu Electricity Supply Code, 2004 — Draft Amendments, 2023
Amendments to the Tamil Nadu Electricity Supply Code
Draft regulationDated 27 Apr 2023TNERC/SC/- ……. dated xx.04.2023
Draft
A proposal that has since been finalised as the Tamil Nadu Electricity Supply Code, 2004 — Amendments, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft notification by the Tamil Nadu Electricity Regulatory Commission proposing roughly two dozen amendments to the Tamil Nadu Electricity Supply Code Regulations, 2004, published for objections and suggestions. Comments are invited by 26.05.2023, and the draft will be taken into consideration after thirty days from its publication on the TNERC website (p1). It is signed by the Secretary on 26.04.2023 (p27, p30).
The first block (pp2–5) tightens definitions and charges. It inserts a definition of 'unauthorised use of electricity' keyed to section 126 and confines section 135 to theft of energy and illegal restoration (p2), updates the residual-definition clause to recognise the Electricity (Rights of Consumers) Rules, 2020 and other Commission regulations, adds two miscellaneous charges recoverable by the licensee, and rewrites the excess demand charge regime for HT and LT — with a slab-and-occurrence table, notices to the consumer, automatic revision of sanctioned demand and forced conversion of larger LT services to HT (pp3–5). It also restates the security-deposit refund rule and the list of application registration charges (p5).
The second block (pp6–12) is metering: the consumer's option to buy his own meter, seal tracking, web-portal publication of approved meters and specifications, smart and pre-payment rollout, open access interface meters, transformer-loss loading for LT services above 112 kW, the meter-testing and NABL third-party re-test procedure, replacement of defective or burnt meters, a new rule on common neutrals and earth leakage, meter-reading frequency, the Revised Test Report and the new 'dynamic' seasonal reduction of demand.
The third block (pp10–15) is billing and payment: bill generation and despatch timelines, SMS or e-mail treated as bill-cum-notice, AMR/AMI notices by electronic means, payment modes, deposit refunds by direct credit, recovery across a consumer's other connections, restoration of supply and instalment reconnection.
The last operative block (pp15–27) rewrites the assessment provisions and replaces Forms 8, 8-A and 9 to 13, separating section 126 unauthorised-use orders from section 135 theft orders and the section 152 compounding order. An explanatory statement (pp28–30) sets out the reasons, including the Commission's order in M.P. No. 28 of 2021 dated 05.05.2022, and a comparative-statement annexure (pp31–70) reproduces existing and proposed text side by side.
Read with this
The regulation
- Dated 21 Jul 2004Tamil Nadu Electricity Supply Code (TNESC)
Amendments and corrections
- Dated 22 Nov 2005Tamil Nadu Electricity Supply (Amendment) Code 2005 — load addition/reduction, surcharge and BPSC
- Dated 19 May 2006Tamil Nadu Electricity Supply (Amendment) Code 2006
- Dated 20 Sep 2006Tamil Nadu Electricity Supply Code — Explanation on Refund of Tariff Minimum, 2006
- Dated 10 Apr 2007Tamil Nadu Electricity Supply (Amendment) Code, 2007
- Dated 25 May 2007Tamil Nadu Electricity Supply Code, 2004 — Amendment Code 2007
- Dated 23 Aug 2007Tamil Nadu Electricity Supply Code, 2004 — Second Amendment Code, 2007
- Dated 3 Dec 2007Tamil Nadu Electricity Supply Code, Distribution Code and Standard of Performance (Amendment) Regulations 2007
- Dated 14 Dec 2007Tamil Nadu Electricity Supply Code — Second Amendment, 2007
- Dated 6 Jun 2008Tamil Nadu Electricity Supply (Amendment) Code 2008
- Dated 31 Jul 2008Tamil Nadu Electricity Supply (Amendment) Code 2008 — disconnection for arrears
- Dated 15 Dec 2008Tamil Nadu Electricity Supply (Amendment) Code, 2008
- Dated 27 Feb 2009Tamil Nadu Electricity Supply Code, 2004 — Amendment Code, 2009
- Dated 15 Jun 2009Tamil Nadu Electricity Supply Code, 2004 — Amendment Code, 2009
- Dated 29 Jun 2009Tamil Nadu Electricity Supply (Amendment) Code 2009
- Dated 9 Oct 2009Amendment to Regulation 19, 20 & 23 of Supply Code
- Dated 29 Dec 2009Tamil Nadu Electricity Supply (Amendment) Code, 2009
- Dated 6 May 2010Tamil Nadu Electricity Supply (Amendment) Code 2010
- Dated 25 Oct 2010Tamil Nadu Electricity Supply Code, 2005 — Amendment Code 2010
- Dated 27 May 2011Tamil Nadu Electricity Supply (Amendment) Code, 2011
- Dated 29 Nov 2012Tamil Nadu Electricity Supply Code Amendment, 2012
- Dated 12 Sep 2013Tamil Nadu Electricity Supply Code — Minimum Charges Amendment, 2013
- Dated 23 Sep 2013Tamil Nadu Electricity Supply Code and State Advisory Committee Regulations — Amendments, 2013
- Dated 26 Nov 2013Tariff Regulations, Distribution Code and Supply Code — Amendments, 2013
- Dated 3 Jun 2014Tamil Nadu Electricity Supply Code, 2004 — Regulation 22 Amendment, 2014
- Dated 1 Jul 2014Tamil Nadu Electricity Supply Code — Amendment to Regulations 4, 5, 7, 15 and 27, 2014
- Dated 5 Nov 2014Tamil Nadu Electricity Supply Code — Errata to Notification, 2014
- Dated 22 Apr 2015Tamil Nadu Electricity Supply Code, 2004 — Mode of Payment Amendment, 2015
- Dated 2 Mar 2018Tamil Nadu Electricity Distribution Code Amendments, 2018
- Dated 2 Mar 2018Tamil Nadu Electricity Supply Code — Amendments, 2018
- Dated 18 Dec 2019Tamil Nadu Electricity Supply Code — Amendments, 2019
- Dated 9 Jun 2020Tamil Nadu Electricity Supply Code and Distribution Code — LT/HT 150 kW Amendment, 2020
- Dated 27 Jun 2020Tamil Nadu Electricity Supply Code, 2004 — Amendment (Regulation 14A, AMR/AMI billing notice)
- Dated 16 Jul 2020Tamil Nadu Electricity Supply Code and Distribution Code — Amendments, 2020
- Dated 16 Jul 2020Tamil Nadu Electricity Distribution Code — Agricultural Service Connection Amendments, 2020
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendments, 2021
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendment, 2021
- Dated 26 May 2021Tamil Nadu Electricity Supply Code, 2004 — Wheeling and Network Charges Amendment, 2021
- Dated 29 Mar 2022Tamil Nadu Electricity Supply Code, 2004 — Harmonic Control Amendment, 2022
- Dated 26 Jul 2022Tamil Nadu Electricity Supply Code, 2004 — Amendment, 2022
- Dated 2 Sep 2023Tamil Nadu Electricity Supply Code, 2004 — Amendments, 2023
Consolidated copies, for reference (4)
- Dated 31 Jul 2008Tamil Nadu Electricity Supply Code — Consolidated, as amended up to 31.7.2008
- Dated 31 Dec 2009Tamil Nadu Electricity Supply Code (TNESC) — Consolidated, as amended upto 31-12-2009
- Dated 31 Dec 2010Tamil Nadu Electricity Supply Code — Consolidated as amended upto 31-12-2010
- Dated 31 Mar 2024Tamil Nadu Electricity Supply Code — Consolidated as amended up to 31-03-2024
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 11 Apr 2006Tamil Nadu Electricity Supply Code — 2006 Amendment
- Dated 4 Dec 2009Tamil Nadu Electricity Supply (Amendment) Code, 2009
- Dated 21 Jun 2010Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2010 — Draft
- Dated 13 Jul 2010Tamil Nadu Electricity Supply (Amendment) Code, 2010 — Draft
- Dated 14 Jan 2011Tamil Nadu Electricity Supply (Amendment) Code, 2011 — Draft
- Dated 29 Mar 2011Draft Consultative Paper on Non-Tariff Related Miscellaneous Charges — Supply of CMRI Data to HT Consumers
- Dated 5 Apr 2011Tamil Nadu Electricity Supply Code, 2004 — 2011 Amendment — Draft
- Dated 30 Sep 2011Tamil Nadu Electricity Supply (Amendment) Code, 2011 — Security Deposit for Non-Owner Consumers
- Dated 24 Aug 2012Tamil Nadu Electricity Supply (Amendment) Code, 2012 — Draft
- Dated 28 Jun 2013Tamil Nadu Electricity Supply Code, 2005 — Draft Amendment — Minimum Charges for Disconnected HT Services
- Dated 12 Sep 2013Draft Amendment to Regulation 3 of the Tamil Nadu Electricity Supply Code, 2013
- Dated 27 May 2014Tamil Nadu Electricity Supply Code, 2004 — Additional Security Deposit (Partial Open Access) Amendment, 2014 — Draft
- Dated 7 Jan 2015Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment
- Dated 24 May 2017Tamil Nadu Electricity Supply Code — Power Factor Disincentive Amendment, 2017 — Draft
- Dated 6 Jul 2017Tamil Nadu Electricity Supply Code — Draft Amendment, 2017
- Dated 9 Jul 2019Draft Amendment to the Tamil Nadu Electricity Supply Code, 2019
- Dated 7 Nov 2019Tamil Nadu Electricity Supply Code — Draft Amendment, 2019
- Dated 6 Mar 2020Draft Amendments to the Tamil Nadu Electricity Supply Code, 2020
- Dated 9 Oct 2020Tamil Nadu Electricity Supply Code, 2004 — Power Factor and Minimum Charges Amendment, 2020 — Draft
- Dated 23 Dec 2020Procedure of Assessment where Bi-directional Meter is Defective or Absent — Draft Amendment to the Tamil Nadu Electricity Supply Code, 2004
- Dated 19 Mar 2021Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment (Wheeling Charges)
- Dated 29 Jun 2021Tamil Nadu Electricity Supply Code — Harmonic Limits Amendment, 2021 — Draft
- Dated 9 Jun 2022Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment, 2022
- Dated 28 Jun 2022Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment
32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.