Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code, 2004 — Draft Amendments, 2023

Amendments to the Tamil Nadu Electricity Supply Code

Draft regulationDated 27 Apr 2023TNERC/SC/- ……. dated xx.04.2023

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply Code, 2004 — Amendments, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft notification by the Tamil Nadu Electricity Regulatory Commission proposing roughly two dozen amendments to the Tamil Nadu Electricity Supply Code Regulations, 2004, published for objections and suggestions. Comments are invited by 26.05.2023, and the draft will be taken into consideration after thirty days from its publication on the TNERC website (p1). It is signed by the Secretary on 26.04.2023 (p27, p30).

The first block (pp2–5) tightens definitions and charges. It inserts a definition of 'unauthorised use of electricity' keyed to section 126 and confines section 135 to theft of energy and illegal restoration (p2), updates the residual-definition clause to recognise the Electricity (Rights of Consumers) Rules, 2020 and other Commission regulations, adds two miscellaneous charges recoverable by the licensee, and rewrites the excess demand charge regime for HT and LT — with a slab-and-occurrence table, notices to the consumer, automatic revision of sanctioned demand and forced conversion of larger LT services to HT (pp3–5). It also restates the security-deposit refund rule and the list of application registration charges (p5).

The second block (pp6–12) is metering: the consumer's option to buy his own meter, seal tracking, web-portal publication of approved meters and specifications, smart and pre-payment rollout, open access interface meters, transformer-loss loading for LT services above 112 kW, the meter-testing and NABL third-party re-test procedure, replacement of defective or burnt meters, a new rule on common neutrals and earth leakage, meter-reading frequency, the Revised Test Report and the new 'dynamic' seasonal reduction of demand.

The third block (pp10–15) is billing and payment: bill generation and despatch timelines, SMS or e-mail treated as bill-cum-notice, AMR/AMI notices by electronic means, payment modes, deposit refunds by direct credit, recovery across a consumer's other connections, restoration of supply and instalment reconnection.

The last operative block (pp15–27) rewrites the assessment provisions and replaces Forms 8, 8-A and 9 to 13, separating section 126 unauthorised-use orders from section 135 theft orders and the section 152 compounding order. An explanatory statement (pp28–30) sets out the reasons, including the Commission's order in M.P. No. 28 of 2021 dated 05.05.2022, and a comparative-statement annexure (pp31–70) reproduces existing and proposed text side by side.

Standard name
Electricity Supply Code
Primary topics
Metering, Billing and payment, Theft and unauthorised use

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document