TNERC · Tamil Nadu Electricity Regulatory Commission
Tamil Nadu Electricity Supply Code — Draft Amendment, 2017
Draft Notification No. TNERC/SC/7 –……. dated -2017.
Draft amendmentDated 6 Jul 2017TNERC/SC/7 dated -2017
Draft
A proposal that has since been finalised as the Tamil Nadu Electricity Distribution Code Amendments, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Tamil Nadu Electricity Regulatory Commission draft notification proposing three changes to the Tamil Nadu Electricity Supply Code and inviting public comment on them (p1). It is explicitly a draft: objections or suggestions must reach the Secretary, TNERC, in duplicate by 05-08-2017, and the Commission says it will take the draft up only after thirty days from publication on the TNERC website (p1).
The first change omits regulation 4(1)(vi) (p1). That provision requires the licensee, when extending a temporary supply, to ensure advance current consumption (CC) charges are adequate and to adjust CC charges against them. The explanatory statement gives the reason: regulation 39(2)(ii) of the Tamil Nadu Electricity Distribution Code already requires a security deposit equal to three times the tariff charges for the whole temporary supply period, so the Supply Code requirement is said to run contrary to it (p3).
The second change replaces regulation 5(2)(iii) on excess demand charges for temporary supply (p1–2). The existing formula — a difference between amounts computed for a back period and charges already recovered — gives way to rate-based charging: for HT supply, double the normal rate on demand above sanctioned demand; for LT supply, 1% of total energy charges per kW or part above sanctioned demand where the recorded demand does not exceed 112 kW, and the general LT excess-demand provisions where it does (p1–2). The stated aim is to put temporary supply on par with regular HT or LT supply (p3).
The third change replaces regulation 22(3) (p2). Restoration of an HT service connection disconnected for six months or more will need approval of the competent authority on safety and security of the installation, where the existing text says one year. The explanatory statement ties this to the inspection requirement in the CEA (Measures relating to safety and electric supply) Regulations, 2010 (p3).
Pages 4–5 set the existing and the proposed texts of regulations 4, 5 and 22 side by side.
Read with this
The regulation
- Dated 21 Jul 2004Tamil Nadu Electricity Supply Code (TNESC)
Amendments and corrections
- Dated 22 Nov 2005Tamil Nadu Electricity Supply (Amendment) Code 2005 — load addition/reduction, surcharge and BPSC
- Dated 19 May 2006Tamil Nadu Electricity Supply (Amendment) Code 2006
- Dated 20 Sep 2006Tamil Nadu Electricity Supply Code — Explanation on Refund of Tariff Minimum, 2006
- Dated 10 Apr 2007Tamil Nadu Electricity Supply (Amendment) Code, 2007
- Dated 25 May 2007Tamil Nadu Electricity Supply Code, 2004 — Amendment Code 2007
- Dated 23 Aug 2007Tamil Nadu Electricity Supply Code, 2004 — Second Amendment Code, 2007
- Dated 3 Dec 2007Tamil Nadu Electricity Supply Code, Distribution Code and Standard of Performance (Amendment) Regulations 2007
- Dated 14 Dec 2007Tamil Nadu Electricity Supply Code — Second Amendment, 2007
- Dated 6 Jun 2008Tamil Nadu Electricity Supply (Amendment) Code 2008
- Dated 31 Jul 2008Tamil Nadu Electricity Supply (Amendment) Code 2008 — disconnection for arrears
- Dated 15 Dec 2008Tamil Nadu Electricity Supply (Amendment) Code, 2008
- Dated 27 Feb 2009Tamil Nadu Electricity Supply Code, 2004 — Amendment Code, 2009
- Dated 15 Jun 2009Tamil Nadu Electricity Supply Code, 2004 — Amendment Code, 2009
- Dated 29 Jun 2009Tamil Nadu Electricity Supply (Amendment) Code 2009
- Dated 9 Oct 2009Amendment to Regulation 19, 20 & 23 of Supply Code
- Dated 29 Dec 2009Tamil Nadu Electricity Supply (Amendment) Code, 2009
- Dated 6 May 2010Tamil Nadu Electricity Supply (Amendment) Code 2010
- Dated 25 Oct 2010Tamil Nadu Electricity Supply Code, 2005 — Amendment Code 2010
- Dated 27 May 2011Tamil Nadu Electricity Supply (Amendment) Code, 2011
- Dated 29 Nov 2012Tamil Nadu Electricity Supply Code Amendment, 2012
- Dated 12 Sep 2013Tamil Nadu Electricity Supply Code — Minimum Charges Amendment, 2013
- Dated 23 Sep 2013Tamil Nadu Electricity Supply Code and State Advisory Committee Regulations — Amendments, 2013
- Dated 26 Nov 2013Tariff Regulations, Distribution Code and Supply Code — Amendments, 2013
- Dated 3 Jun 2014Tamil Nadu Electricity Supply Code, 2004 — Regulation 22 Amendment, 2014
- Dated 1 Jul 2014Tamil Nadu Electricity Supply Code — Amendment to Regulations 4, 5, 7, 15 and 27, 2014
- Dated 5 Nov 2014Tamil Nadu Electricity Supply Code — Errata to Notification, 2014
- Dated 22 Apr 2015Tamil Nadu Electricity Supply Code, 2004 — Mode of Payment Amendment, 2015
- Dated 2 Mar 2018Tamil Nadu Electricity Distribution Code Amendments, 2018
- Dated 2 Mar 2018Tamil Nadu Electricity Supply Code — Amendments, 2018
- Dated 18 Dec 2019Tamil Nadu Electricity Supply Code — Amendments, 2019
- Dated 9 Jun 2020Tamil Nadu Electricity Supply Code and Distribution Code — LT/HT 150 kW Amendment, 2020
- Dated 27 Jun 2020Tamil Nadu Electricity Supply Code, 2004 — Amendment (Regulation 14A, AMR/AMI billing notice)
- Dated 16 Jul 2020Tamil Nadu Electricity Supply Code and Distribution Code — Amendments, 2020
- Dated 16 Jul 2020Tamil Nadu Electricity Distribution Code — Agricultural Service Connection Amendments, 2020
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendments, 2021
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendment, 2021
- Dated 26 May 2021Tamil Nadu Electricity Supply Code, 2004 — Wheeling and Network Charges Amendment, 2021
- Dated 29 Mar 2022Tamil Nadu Electricity Supply Code, 2004 — Harmonic Control Amendment, 2022
- Dated 26 Jul 2022Tamil Nadu Electricity Supply Code, 2004 — Amendment, 2022
- Dated 2 Sep 2023Tamil Nadu Electricity Supply Code, 2004 — Amendments, 2023
Consolidated copies, for reference (4)
- Dated 31 Jul 2008Tamil Nadu Electricity Supply Code — Consolidated, as amended up to 31.7.2008
- Dated 31 Dec 2009Tamil Nadu Electricity Supply Code (TNESC) — Consolidated, as amended upto 31-12-2009
- Dated 31 Dec 2010Tamil Nadu Electricity Supply Code — Consolidated as amended upto 31-12-2010
- Dated 31 Mar 2024Tamil Nadu Electricity Supply Code — Consolidated as amended up to 31-03-2024
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 11 Apr 2006Tamil Nadu Electricity Supply Code — 2006 Amendment
- Dated 4 Dec 2009Tamil Nadu Electricity Supply (Amendment) Code, 2009
- Dated 21 Jun 2010Power Procurement from New and Renewable Sources of Energy Regulations, 2008 — Amendment, 2010 — Draft
- Dated 13 Jul 2010Tamil Nadu Electricity Supply (Amendment) Code, 2010 — Draft
- Dated 14 Jan 2011Tamil Nadu Electricity Supply (Amendment) Code, 2011 — Draft
- Dated 29 Mar 2011Draft Consultative Paper on Non-Tariff Related Miscellaneous Charges — Supply of CMRI Data to HT Consumers
- Dated 5 Apr 2011Tamil Nadu Electricity Supply Code, 2004 — 2011 Amendment — Draft
- Dated 30 Sep 2011Tamil Nadu Electricity Supply (Amendment) Code, 2011 — Security Deposit for Non-Owner Consumers
- Dated 24 Aug 2012Tamil Nadu Electricity Supply (Amendment) Code, 2012 — Draft
- Dated 28 Jun 2013Tamil Nadu Electricity Supply Code, 2005 — Draft Amendment — Minimum Charges for Disconnected HT Services
- Dated 12 Sep 2013Draft Amendment to Regulation 3 of the Tamil Nadu Electricity Supply Code, 2013
- Dated 27 May 2014Tamil Nadu Electricity Supply Code, 2004 — Additional Security Deposit (Partial Open Access) Amendment, 2014 — Draft
- Dated 7 Jan 2015Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment
- Dated 24 May 2017Tamil Nadu Electricity Supply Code — Power Factor Disincentive Amendment, 2017 — Draft
- Dated 9 Jul 2019Draft Amendment to the Tamil Nadu Electricity Supply Code, 2019
- Dated 7 Nov 2019Tamil Nadu Electricity Supply Code — Draft Amendment, 2019
- Dated 6 Mar 2020Draft Amendments to the Tamil Nadu Electricity Supply Code, 2020
- Dated 9 Oct 2020Tamil Nadu Electricity Supply Code, 2004 — Power Factor and Minimum Charges Amendment, 2020 — Draft
- Dated 23 Dec 2020Procedure of Assessment where Bi-directional Meter is Defective or Absent — Draft Amendment to the Tamil Nadu Electricity Supply Code, 2004
- Dated 19 Mar 2021Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment (Wheeling Charges)
- Dated 29 Jun 2021Tamil Nadu Electricity Supply Code — Harmonic Limits Amendment, 2021 — Draft
- Dated 9 Jun 2022Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment, 2022
- Dated 28 Jun 2022Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment
- Dated 27 Apr 2023Tamil Nadu Electricity Supply Code, 2004 — Draft Amendments, 2023
32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.