Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code — Draft Amendment, 2017

Draft Notification No. TNERC/SC/7 –……. dated -2017.

Draft amendmentDated 6 Jul 2017TNERC/SC/7 dated -2017

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Distribution Code Amendments, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Electricity Regulatory Commission draft notification proposing three changes to the Tamil Nadu Electricity Supply Code and inviting public comment on them (p1). It is explicitly a draft: objections or suggestions must reach the Secretary, TNERC, in duplicate by 05-08-2017, and the Commission says it will take the draft up only after thirty days from publication on the TNERC website (p1).

The first change omits regulation 4(1)(vi) (p1). That provision requires the licensee, when extending a temporary supply, to ensure advance current consumption (CC) charges are adequate and to adjust CC charges against them. The explanatory statement gives the reason: regulation 39(2)(ii) of the Tamil Nadu Electricity Distribution Code already requires a security deposit equal to three times the tariff charges for the whole temporary supply period, so the Supply Code requirement is said to run contrary to it (p3).

The second change replaces regulation 5(2)(iii) on excess demand charges for temporary supply (p1–2). The existing formula — a difference between amounts computed for a back period and charges already recovered — gives way to rate-based charging: for HT supply, double the normal rate on demand above sanctioned demand; for LT supply, 1% of total energy charges per kW or part above sanctioned demand where the recorded demand does not exceed 112 kW, and the general LT excess-demand provisions where it does (p1–2). The stated aim is to put temporary supply on par with regular HT or LT supply (p3).

The third change replaces regulation 22(3) (p2). Restoration of an HT service connection disconnected for six months or more will need approval of the competent authority on safety and security of the installation, where the existing text says one year. The explanatory statement ties this to the inspection requirement in the CEA (Measures relating to safety and electric supply) Regulations, 2010 (p3).

Pages 4–5 set the existing and the proposed texts of regulations 4, 5 and 22 side by side.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Electrical safety

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document