Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Draft Amendment to Regulation 3 of the Tamil Nadu Electricity Supply Code, 2013

Draft Notification No. TNERC/SC/7 – . dated -2013.

Draft amendmentDated 12 Sep 2013TNERC/SC/7

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply Code — Minimum Charges Amendment, 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

TNERC's draft amendment to the Tamil Nadu Electricity Supply Code (p1) would add a new sub-regulation (4) to regulation 3, allowing the Chief Executive Officer of the distribution licensee to permit supply, or additional load, to be given at the voltage level already available in an area — rather than the eligible voltage level regulation 3(1) would otherwise require — where establishing the higher-voltage network would be very costly and the arrangement is technically feasible (p1). The relief is drafted as a non-obstante override of sub-regulation (1) and is confined to 'appropriate cases', with no criteria for invoking it stated (p1).

The document is a consultation draft, not a made amendment. The Commission gives notice that it will publish the proposed amendment in the Tamil Nadu Government Gazette fifteen days after hosting it on its website, and invites suggestions, modifications or objections to the Secretary within that period (p1).

An explanatory statement (p2) grounds the change in TANGEDCO's cost of building infrastructure where the eligible voltage level does not exist, arguing that supply at the existing voltage would cut that expenditure. A closing comparative statement (p3) sets the existing provision against the proposed text.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document