Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply (Amendment) Code, 2012 — Draft

Tamil Nadu Electricity Supply (Amendment) Code, 2012

Draft amendmentDated 24 Aug 2012TNERC/SC/7

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply Code Amendment, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This two-page draft notification from the Tamil Nadu Electricity Regulatory Commission proposes an amendment to the Tamil Nadu Electricity Supply Code (p1). It recalls that the Supply Code was notified under section 50 read with section 181 of the Electricity Act 2003 and published in the Tamil Nadu Government Gazette on 1 September 2004, and says an amendment is needed to specify the category of supply for a consumer seeking additional demand on an existing service connection (p1). Because the amendment is subject to previous publication, the notice says it will be gazetted after fifteen days from being hosted on the Commission’s website; suggestions or objections in that window are to go to the Secretary at the Chennai address given (p1).

Clause 1 names the instrument the Tamil Nadu Electricity Supply (Amendment) Code, 2012 and says it comes into force on Gazette publication (p1). Clause 2 inserts an Explanation into regulation 3(2): “existing service connection / installation” means a connection effected on or before 21-03-2012, the date on which sub-regulation (2) came into force (p2). The draft is signed by the Secretary (p2).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document