Tamil Nadu Electricity Supply (Amendment) Code 2005 — load addition/reduction, surcharge and BPSC

Tamil Nadu Electricity Supply (Amendment) Code 2005

AmendmentDated 22 Nov 2005Published in the Gazette 7 Dec 2005Notification No. TNERC / SC / 7-1/ dated 22.11.2005

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A short TNERC amendment to the Tamil Nadu Electricity Supply Code, 2004. The preamble (p1) states the amendments are needed to remove difficulties and misconceptions in implementing the Supply Code, and recites that the previous-publication condition has been satisfied. It is made under s.181 read with s.50 of the Electricity Act, 2003, and was notified on 22.11.2005, appearing in the Tamil Nadu Government Gazette of 7 December 2005.

The operative text (pp2–3) has four clauses. Clause 1 gives the short title and commencement, effective from gazette publication. Clause 2 inserts a new clause (iv) into Regulation 5(2), barring sanction of addition or reduction of load for LT services and of demand for HT services unless outstanding dues on the same service connection are paid (p2). Clause 3 rewrites Regulation 5(4)(iv), setting the LT surcharge on outstanding amounts towards the price of electricity at 1.5% per month, but 1% per month for Local Bodies and Government Departments (p2). Clause 4 rewrites Regulation 5(4)(v) for HT consumers: 1.5% per month for the notice period; where the licensee grants extension beyond the notice period up to the end of the due month, BPSC becomes 2% per month from expiry of the due date for a full month irrespective of the number of days delayed; where no extension is granted, or the delay continues past it, the rate reverts to 1.5% per month (pp2–3). The notification is signed by the Commission's Secretary.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Late payment surcharge and rebate, Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document