Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code, 2004 — Draft Amendment, 2024

Draft amendments to the Tamil Nadu Electricity Supply Code

Draft amendmentDated 13 Jun 2024TNERC/SC/- ……. dated xx.xx.2024

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC consultation draft of amendments to the Tamil Nadu Electricity Supply Code Regulations, 2004, published on the Commission's website for objections and suggestions, with comments invited by 15 July 2024 and signed by the Secretary on 13 June 2024 (p1). The notice invokes s.181 read with s.50 of the Electricity Act 2003 and the s.181(3) publication requirement; the draft will be taken up only after thirty days from publication on the TNERC website (p1).

The operative part is six amendment clauses (pp2–5). Most of the work is on Regulation 4(1)(iv) on current harmonic control. The heading is narrowed to consumers and prosumers of HT/EHT services and charging stations of all voltage levels, and the CEA cross-reference is updated from IEEE 519-2014 to IEEE 519-2022 (p2). A new supply-connection condition requires a self-declaration that harmonic filters will be installed, with current distortion measured within three months of supply and follow-on action under the existing sub-clauses (p2). Amendment 4 inserts a new limb (B) — harmonic current control for generation resources — extending IEEE 519 / 2800-2022 / 1547-2018 limits to wind, inverter-based, hybrid, energy-storage, distributed generation and prosumers acting as generators at 11 kV and above, with prescribed measurement instruments (IEC 61000-4-7 and IEC 61000-4-30 Class A), a notice-and-six-month cure procedure, disconnection on non-compliance, an advance measurement fee, and a self-declaration test for new or expanded connectivity (pp2–4). An Explanation borrowed from IEEE 519-2022 defines maximum demand load current and short-circuit ratio (pp4–5). Clauses 5 and 6 are tidy-ups: omitting the explanation to Regulation 3(2) and deleting notation (c) in Regulation 22(6)(ii) (p5).

The explanatory statement grounds the draft in the Tariff Policy of 28 January 2016, s.86(1)(i) of the Act, the 2019 CEA connectivity amendments, and the Commission's 29 March 2022 amendment applying IEEE 519-2014 to consumers at 11 kV and above and charging stations, and cites a consultative paper with an expert consultant's study on the Commission's website (pp6–7). The Annexure is a side-by-side existing-versus-proposed table of the affected Supply Code text, including the harmonic penalty band table and the Regulation 3 and 22 provisions (pp8–19).

Standard name
Electricity Supply Code
Primary topics
Power quality, Technical standards, New connections and load changes

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document